Skip to main content

New plants for Romania’s asphalt needs

Benninghoven ECO and TBA mixing plants are operating at different locations in Romania. These plants will help the country achieve its aim of improving its road network and extending the total highway distance from 750km to 2,710km, with 223km currently under construction.
October 30, 2020 Read time: 2 mins
Benninghoven has supplied asphalt plants to a number of customers in Romania

In the west of Romania, SDM Timisoara replaced an existing asphalt mixing plant. SDM requires asphalt primarily for rehabilitation projects in and around Timisoara. The decision in terms of plant technology was eventually made in favour of an ECO 2000 transportable asphalt mixing plant in a container design. Of note is that the ECO 2000 in Timisoara is orange to meet the client’s request, which Benninghoven was able to meet due to its new powder-coating facility.

Meanwhile, a ECO 2000 transportable asphalt mixing plant in a container design was also recently commissioned in the north of Romania to replace an old plant. A novel feature is that it is located in the middle of a nature reserve in one of the most beautiful regions of the country. Local authority conditions were correspondingly stringent. However, the proven EVO JET burners from Benninghoven met the strict requirements on efficiency. Featuring the latest frequency control technology, emissions are aid to be minimal.

A third Benninghoven mixing plant, TBA 2000, has recently started producing high quality asphalt in Blejoi, about 50km north of the capital Bucharest.  

Benninghoven's transportable plants (or TBA for short) cover a capacity range from 160-320tonnes/hour and are suited to both semi-mobile and stationary applications. The asphalt mix from this plant is not stored, but is mixed and loaded directly to order.

The design of the plant means that as many formulas as the customer wishes can be entered and managed. The mixing supervisor of the TBA 2000 in Blejoi can react to delays in operations by splitting orders into part-orders or interrupting orders to give priority to others. The residual quantity is then stored automatically and taken into account when the order in question is resumed.

For more information on companies in this article

Related Content

  • Lintec supplies plants for Brazilian highway project
    August 18, 2015
    German manufacturer LINTEC has supplied three of its highly sophisticated, containerised asphalt mixing plants for use on the important BR-163 highway project in Brazil. This is one of several major plant orders for the firm for use in road projects in Latin America. According to LINTEC, its activity in this market is helping contribute to the construction of high quality roads that will last.
  • Advances in asphalt compaction are delivering increased performance
    January 19, 2018
    Advances in asphalt compaction are offering improved performance right across the spectrum of size and capacity – Mike Woof writes. New asphalt compaction machines are offering major gains in performance as firms develop new systems. Large and small asphalt compactors now offer higher output than earlier generation machines, while delivering better quality and lower fuel consumption as well as gains in reliability, durability, safety, ergonomics and operator comfort.
  • Smartphone solutions assure paving quality at a lofty height
    April 1, 2022
    Road construction project with digital documentation and temperature monitoring by Vögele
  • IRF conference tackles transport green targets
    July 4, 2012
    The IRF's 2nd conference on roads and the environment addressed key transport targets, Mike Woof reports Reducing the impact of the road transport sector as a whole was the focus of the IRF's 2nd Roads & Environment Conference. Opening the event, Jean Beauverd, chairman of the IRF in Geneva said, "Evidence of global warming is now unequivocal. Even if we were to stabilise the effects of CO2 emissions, the effects would continue for decades. Eco-friendly processes have not yet reached the full acceptance tha