Skip to main content

New plants for Romania’s asphalt needs

Benninghoven ECO and TBA mixing plants are operating at different locations in Romania. These plants will help the country achieve its aim of improving its road network and extending the total highway distance from 750km to 2,710km, with 223km currently under construction.
October 30, 2020 Read time: 2 mins
Benninghoven has supplied asphalt plants to a number of customers in Romania

In the west of Romania, SDM Timisoara replaced an existing asphalt mixing plant. SDM requires asphalt primarily for rehabilitation projects in and around Timisoara. The decision in terms of plant technology was eventually made in favour of an ECO 2000 transportable asphalt mixing plant in a container design. Of note is that the ECO 2000 in Timisoara is orange to meet the client’s request, which Benninghoven was able to meet due to its new powder-coating facility.

Meanwhile, a ECO 2000 transportable asphalt mixing plant in a container design was also recently commissioned in the north of Romania to replace an old plant. A novel feature is that it is located in the middle of a nature reserve in one of the most beautiful regions of the country. Local authority conditions were correspondingly stringent. However, the proven EVO JET burners from Benninghoven met the strict requirements on efficiency. Featuring the latest frequency control technology, emissions are aid to be minimal.

A third Benninghoven mixing plant, TBA 2000, has recently started producing high quality asphalt in Blejoi, about 50km north of the capital Bucharest.  

Benninghoven's transportable plants (or TBA for short) cover a capacity range from 160-320tonnes/hour and are suited to both semi-mobile and stationary applications. The asphalt mix from this plant is not stored, but is mixed and loaded directly to order.

The design of the plant means that as many formulas as the customer wishes can be entered and managed. The mixing supervisor of the TBA 2000 in Blejoi can react to delays in operations by splitting orders into part-orders or interrupting orders to give priority to others. The residual quantity is then stored automatically and taken into account when the order in question is resumed.

For more information on companies in this article

Related Content

  • Kleemann’s improved jaw crusher increases output
    February 6, 2015
    The key product launch for Kleemann at Intermat is its latest mobile cone crusher. Kleemann’s new MCO 9 EVO cone crusher is designed to work with the firm’s recently introduced Mobicat MC 110 Z EVO mobile jaw crusher, also on display at the event. The new cone crusher now closes a gap in the Kleemann model range and carry out secondary crushing, with the primary function typically being carried out by the firm’s MOBICAT MC 110 EVO mobile jaw crusher.
  • Kleemann’s improved jaw crusher increases output
    January 6, 2017
    The key product launch for Kleemann at Intermat is its latest mobile cone crusher. Kleemann’s new MCO 9 EVO cone crusher is designed to work with the firm’s recently introduced Mobicat MC 110 Z EVO mobile jaw crusher, also on display at the event. The new cone crusher now closes a gap in the Kleemann model range and carry out secondary crushing, with the primary function typically being carried out by the firm’s MOBICAT MC 110 EVO mobile jaw crusher.
  • Ammann has developed a high mobility asphalt plant
    February 17, 2016
    The new Prime 100 mobile asphalt plant from Ammann is designed for high mobility. This continuous plant can deliver 100tonnes/hour and features all of its main components inside a single standard shipping container. A company spokesperson said, “All you have to do is connect the bitumen tank and an electric power source.” The new Prime 100 unit is the latest addition to the Prime range and is a smaller and even more mobile version of the well proven Prime 140, with its 140tonnes/hour capacity. In addition
  • Ammann has developed a high mobility asphalt plant
    January 6, 2017
    The new Prime 100 mobile asphalt plant from Ammann is designed for high mobility. This continuous plant can deliver 100tonnes/hour and features all of its main components inside a single standard shipping container. A company spokesperson said, “All you have to do is connect the bitumen tank and an electric power source.” The new Prime 100 unit is the latest addition to the Prime range and is a smaller and even more mobile version of the well proven Prime 140, with its 140tonnes/hour capacity. In addition