Skip to main content

Liebherr unveils THS 110 D-K crawler concrete pump

Introducing its new THS 110 D-K crawler concrete pump, Liebherr says the model offers a maximum delivery rate of 102m³/hour and features a six-cylinder engine. The concrete pump, which is fitted onto a crawler running gear, is moved and controlled via a radio remote control. The three models in the series of Liebherr crawler concrete pumps are the THS 80 D-K, the THS 110 D-K and the THS 140 D-K, with maximum delivery rates ranging from 65m³/hour to 135m³/hour. Liebherr says the during the design phase it
April 10, 2018 Read time: 2 mins
The concrete pump is moved and controlled via a radio remote control

Introducing its new THS 110 D-K crawler concrete pump, 718 Liebherr says the model offers a maximum delivery rate of 102m³/hour and features a six-cylinder engine.

The concrete pump, which is fitted onto a crawler running gear, is moved and controlled via a radio remote control.

The three models in the series of Liebherr crawler concrete pumps are the THS 80 D-K, the THS 110 D-K and the THS 140 D-K, with maximum delivery rates ranging from 65m³/hour to 135m³/hour.

Liebherr says the during the design phase it was ensured that wear parts for the THS 110 D-K pump could be quickly and easily replaced.

The pump‘s extensive standard scope of delivery includes, for example, a 500litre water tank with water pump and a lockable toolbox, and the unit is said to be well-suited to site work that involves frequent relocation around the construction site.

A typical application for crawler concrete pumps is providing drilling rigs with concrete to fill bored piling foundations.

For more information on companies in this article

Related Content

  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO
  • The concrete option
    July 31, 2012
    Concrete highway construction techniques and technology continues to evolve. Mike Woof reports The recent increases in oil costs are having a knock-on effect for the road construction sector, as asphalt prices have increased noticeably and faster than those for concrete. This has spurred renewed discussion over which construction technique now offers the best long term solution for road building. The debate between those in favour of concrete and those preferring asphalt for highway construction has been on
  • Enter the dragon: Changsha International Construction Equipment Exhibition
    July 12, 2019
    Changsha - one of China’s megacities - welcomed the global construction fraternity to the recent and first Changsha International Construction Equipment Exhibition
  • Hydraulic drilling rig offer performance and versatility
    January 6, 2017
    Soilmec has introduced a hydraulic drilling rig with a range of features for versatility and performance in drilling and foundation preparation while also ensuring operator comfort. The SR-45 is built with high stress steel that has enabled Soilmec to achieve a more compact mast allowing a larger cab to be fitted for the comfort of the operator. Walkways, handrails and a camera system with LCD screen have also been designed with optimal operator safety in mind. The rotary table of the rig is compact with a