Skip to main content

Learner driver

Regular readers of this page in World Highways will be familiar with a South Korean market trader who has clocked a record number of attempts at passing a driving test. The woman has finally passed after 950 attempts, having taken the written exam on a near-daily basis since April 2005. Although this written test requires a 60% pass mark she had repeatedly scored 30-50%. However, the 68 year old grandmother still needs to get behind the wheel to pass the practical portion of the test before being allowed a
February 22, 2012 Read time: 2 mins
Regular readers of this page in World Highways will be familiar with a South Korean market trader who has clocked a record number of attempts at passing a driving test. The woman has finally passed after 950 attempts, having taken the written exam on a near-daily basis since April 2005. Although this written test requires a 60% pass mark she had repeatedly scored 30-50%. However, the 68 year old grandmother still needs to get behind the wheel to pass the practical portion of the test before being allowed a licence. Meanwhile in the UK a bungling leaner driver managed to turn her instructor's car onto its roof. This was only the second time the woman had taken a driving lesson. She unfortunately clipped a gatepost resulting in the Fiat 500 turning over. Neither the woman nor the instructor were seriously injured in the incident, suffering only cuts to their hands and elbows. The instructor has been unruffled by the incident and has taken charge of a new vehicle while the woman is continuing with her lessons.

Related Content

  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • Major Necaxa-Tihuatlan Highway project for Mexico
    October 1, 2014
    A new highway in Mexico is connecting Necaxa with Tihuatlan and the project features challenging terrain - Mauro Nogarin reports In Mexico a landmark highway project is now close to completion, having set a number of records for Latin America.
  • Italy’s horrific bridge collapse is a sign of a wider problem
    January 7, 2019
    The shocking collapse of a major highway bridge in the Italian city of Genoa has highlighted a major problem with regard to poor infrastructure condition in the country. Causing multiple fatalities, the cable-stayed Morandi Bridge suffered a spectacular failure of a central support. Homes have had to be evacuated and it seems likely that the bridge, opened in 1967, will now have to be demolished. However, warnings had been given. The unusual bridge design, with its thin deck and reinforced concrete stays
  • Busy UK motorway junction demolished in tight time frame – Mark Anthony reports
    October 18, 2012
    Military-style planning and overwhelming demolition firepower ensured that Armac Group avoided financial penalties and the wrath of drivers on one of the UK’s busiest motorway intersections. Demolition & Dismantling reports. 6 January is traditionally known for the visit of the three wise men to Bethlehem. However, on 6 January 2012, three wise demolition engineers from Armac Group was tasked with dismantling the monumental structure known as Catthorpe Viaduct: the main overbridge of the M6/M1/A14 interc