Skip to main content

Just stop arguing and build the thing

The news that the preferred route has been announced for a new road and tunnel link that will bypass the UK’s famous Stonehenge stone circle comes after years of debate. The project is for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel, which is the subject of some controversy. Because of the archeological importance of the area, the tunnel has been decided as being the best option for the new route. Building a tunnel will allow much of the important archeologi
December 15, 2017 Read time: 3 mins
The news that the preferred route has been announced for a new road and tunnel link that will bypass the UK’s famous Stonehenge stone circle comes after years of debate.


The project is for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel, which is the subject of some controversy.

Because of the archeological importance of the area, the tunnel has been decided as being the best option for the new route. Building a tunnel will allow much of the important archeological site to remain undisturbed. However some claim that the tunnel, is simply not long enough.

With this in mind it is worth remembering that the Stonehenge Bypass project has been planned since the late 1980s. The project went to public consultation in 1993 and the route was identified in 1995, with it then being withdrawn in 1996. In 1998, the project was put forward again and a preferred route announced in 1999, but after a public inquiry in 2004 and concerns over costs in 2005, it was withdrawn once more in 2007. It seems the work may finally go ahead, but only if it passes a few more hurdles. The dispute over whether a 2.6km tunnel is long enough is just one issue. Other complaints describe the planned tunnel portals as unsightly and say that the existing (and heavily congested) road link should remain.

But nor are such failures to develop much-needed infrastructure links limited to the UK. In the Canadian province of British Colombia came the news recently that plans for a US$2.8 billion, 10-lane bridge crossing to replace the aged George Massey Tunnel near Vancouver had been halted. The 3km-long cable-stayed bridge would have been built to the latest standards and would boost both safety and capacity, cutting congestion for drivers. It is much needed. The tunnel, constructed in the 1950s and opened to traffic in 1959, is no longer fit for purpose. The four-lane tunnel is the subject of serious congestion and does not meet the latest safety standards. More worryingly still, there are concerns as to whether it would withstand an earthquake, as Vancouver lies close to the Cascadia Fault. Perhaps the new Massey Bridge will get the go-ahead, once the local politicians realise that not to build it will cause more fuss in the long run. Only time will tell.

Related Content

  • $1 billion Bengaluru road tunnel
    June 25, 2025
    A $1 billion Bengaluru road tunnel project is planned.
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • Students received charges
    February 23, 2012
    Five Canadian students received criminal charges when a fun prank they planned went wrong. The engineering students had intended to lower the carcass of a Volkswagen Beetle car from the Iron Workers Memorial Bridge in Vancouver. The students clearly need to spend more time studying as they miscalculated the stresses involved and the cables they selected failed under the load. The car then fell into Vancouver harbour and the students were arrested and charged for causing over C$5,000 of damage. Canadian engi
  • IRF World Meeting: Strong business opportunities in a growing region
    September 26, 2013
    The 17th IRF World Meeting & Exhibition offers a chance for the industry to see what is going on in the field of infrastructure, not only in Riyadh but also in the whole of Saudi Arabia and the wider Gulf region. According to IRF chairman and mayor of Riyadh Eng Abdullah A Al-Mogbel, “Ongoing infrastructure programs concern not only roads and railways, but a whole swath of civil engineering projects — I am convinced many more companies that are not currently operating in the Kingdom should take this opportu