Skip to main content

Jumbo problems

In the US three elephants caused confusion after they escaped from handlers at a circus and the animals damaged a number of vehicles before they could be recaptured. According to bystanders, the elephants rampaged past several vehicles in a parking lot, tearing off mirrors, damaging bodypanels and breaking windows.
May 16, 2014 Read time: 1 min
In the US three elephants caused confusion after they escaped from handlers at a circus and the animals damaged a number of vehicles before they could be recaptured. According to bystanders, the elephants rampaged past several vehicles in a parking lot, tearing off mirrors, damaging bodypanels and breaking windows.

Luckily, neither the elephants nor any people in the area were injured. However the vehicle owners will be likely to raise some eyebrows at the insurance firms when their claims are handled.

Related Content

  • Work begins on Stockholm’s new bypass
    August 22, 2016
    The first tunnels are being excavated for the huge bypass tunnel in Sweden’s capital Stockholm – Adrian Greeman writes. After years of preparation and design, blasting and rock moving for Sweden's largest infrastructure project began south of the city this year. It sets in train a decade-long project that will create a new half-ring dual three-lane motorway for the city, 20km long. With most of it deep underground, it will also be one of Europe's largest ever road tunnels. The scheme is aimed at transformin
  • Earthmoving machines the backbone of construction
    February 7, 2012
    Earthmoving machines remain the backbone of construction operations - writes Mike Woof. ADTs, excavators and wheeled loaders play pivotal roles in most construction jobs with the earthmoving stage providing a key component of most projects.
  • The road to climate change mitigation starts at Highways UK
    February 17, 2020
    David Arminas explored climate change innovation on display at Highways UK in Birmingham, England
  • Ageing Liberty Tunnels in US refurbished with hydrodemolition
    May 13, 2015
    Hydrodemolition surface preparation keeps Liberty Tunnel rehabilitation project on schedule in Pittsburgh. The Pennsylvania state Department of Transportation selected hydrodemolition surface preparation for the US$18.8 million rehabilitation of Pittsburgh’s Liberty Tunnels. Time was of the essence to complete the project on deadline without penalties and hydrodemolition was selected as it offered a fast and cost-effective method to prepare the tunnel walls for a new, shotcrete surface. This methods off