Skip to main content

Ice bound

A car owner in China had something of a shock when he returned to his vehicle and found it covered in ice. The car had been parked underneath a bridge in Changchun, in the northern province of Jilin and the day had started sunny and warm, which resulted in a thaw.
June 24, 2013 Read time: 1 min
A car owner in China had something of a shock when he returned to his vehicle and found it covered in ice. The car had been parked underneath a bridge in Changchun, in the northern province of Jilin and the day had started sunny and warm, which resulted in a thaw. Ice that had formed on the bridge melted and fell onto the vehicle but a drop in temperature caused this to freeze once more, covering the front of the car in a thick layer of ice.

Related Content

  • Springtime for the use of analytics
    April 6, 2021
    Samu Karanko of Vaisala Digital argues for more - and better - use of big data analytics to predict winter weather patterns in order to keep roads clear of snow and ice
  • CECE 2018 conference Rome: the sector powers up for digitisation
    March 20, 2019
    Getting the human-machine interface for equipment automation right is a lot trickier than expected. David Arminas reports from the CECE conference in Rome For many contractors, digitisation is key for improving on-site operational efficiency. But it may be time to take stock of progress and examine what does and doesn’t work. That is not to say that the anchors should be thrown out to halt development. Far from it. In the past eight months, the CECE - Committee for European Construction Equipment – led
  • Sangamo wins the winter battle with a Wirtgen Slipform Paver SP 15i
    January 19, 2016
    Winter was coming in the northern US state of Illinois and Sangamo Construction had to build 1.5km of bridge parapets just before the end of the construction season. Sangamo Construction was contracted to work on five bridges where some parapets needed to be 1m high x 48cm thick at the bottom, tapering to a width of just under 27cm at the top, and with a perpendicular rear wall. As much as 26m3 of concrete were processed just for the construction of the four 150m-long parapets on the twin bridges on Interst
  • New methods for non-destructive concrete testing
    August 29, 2017
    How best is it possible to assess the state of concrete in a road pavement, bridge deck or tunnel wall? One of the most reliable ways is to take a core of concrete from the structure to analyse and test in the laboratory. One downside to this method is that doing the test creates weak points in the structure that must then be repaired. Another is that the frequency of such cores cannot be too great – so it is possible that some problem areas will be missed. New technologies from the world of geospatial eng