Skip to main content

Hyundai heads for demolition with high-reach R520LC at Conexpo

Hyundai has revealed a high-reach demolition spec excavator at Conexpo 2014 this week, based on its 52tonne R520LC-9A. The R520LC-9A DM, as it is to be known, gets a tilting cab and a high-reach configuration that offers a working height of up to 26.1m.
March 5, 2014 Read time: 1 min
High reach demolition from Hyundai with the R520LC
236 Hyundai has revealed a high-reach demolition spec excavator at Conexpo 2014 this week, based on its 52tonne R520LC-9A. The R520LC-9A DM, as it is to be known, gets a tilting cab and a high-reach configuration that offers a working height of up to 26.1m.

The three-piece front-end uses a 13.7m boom, 2.7m intermediate arm and 8m arm, allowing a maximum working reach of 14.3M. It all adds up to a much heavier excavator and sees the R520LC-9A DM tipping the scales at 60tonnes.

Power comes from a 196 Cummins QSX11.9 interim Tier 4/Stage IIIB engine rated at 263kW. Long life components include pivot bushings designed for 250hour greasing intervals, which use polymer shims to resist wear and reduce noise.

Extended life hydraulic filters with 1,000hour service intervals and long life hydraulic oil offering a 5,000hour service life are elements that contribute to reduced operating costs for buyers of the R520LC-9A DM.
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.hceamericas.com Vist the Hyundai Website false http://www.hceamericas.com%20/ false false%>

For more information on companies in this article

Related Content

  • BLS Enterprises is offering new milling machine trackpads
    April 11, 2013
    Component specialist BLS Enterprises is offering a durable replacement track pad for use on Wirtgen milling machines. President Barry Stoughton said, “We have a direct replacement for the EPS system.” He said that this two part pad system allows the pad to bolt directly onto the track. Long life and durability are claimed, as well as ease of replacement.
  • Cheng Gong’s state-of-the-art factory
    January 6, 2017
    Cheng Gong’s new factory in the central city Chengdu was completed in 2011. This state-of-the-art facility is capable of producing up to 30,000 units/year, although current production is below that level following the downturn in Chinese domestic demand. Like many of its larger Chinese competitors, Cheng Gong is using the lull to focus more of its attention on developing its export business. It currently sells most of its export machines to Africa, the Middle East and South America, but is targeting all eme
  • Cheng Gong’s state-of-the-art factory
    November 23, 2012
    Cheng Gong’s new factory in the central city Chengdu was completed in 2011. This state-of-the-art facility is capable of producing up to 30,000 units/year, although current production is below that level following the downturn in Chinese domestic demand. Like many of its larger Chinese competitors, Cheng Gong is using the lull to focus more of its attention on developing its export business. It currently sells most of its export machines to Africa, the Middle East and South America, but is targeting all eme
  • TESMEC Group’s multi-purpose solutions
    April 9, 2013
    The design and production of high powered tracked trenchers for linear excavation and bulk excavation and surface mining is one of many areas of expertise associated with the TESMEC Group. TESMEC also designs and manufactures machines and integrated systems for the stringing and maintenance of power lines; integrated solutions for the efficiency, the management and the monitoring of power grids; machines for the stringing, maintenance and diagnostic of railway power lines; and the design and production of G