Skip to main content

Highways England launches Maintenance Assistance Vehicle - MAV

Highways England has developed a vehicle to help replace overhead highway signs that it says will reduce the need to close lanes and roads during work The vehicle uses a hydraulic scissor lift similar to that seen on catering vehicles that load food into the hold of airplanes at airports. Traditionally, signs are taken down and installed using a flatbed truck, crane and cherry picker, taking up to 40 minutes. However, the Maintenance Assistance Vehicle (MAV) can do this in around 20 to 25 minutes by usin
July 7, 2016 Read time: 2 mins
Easier access with the MAV from Highways England
8100 Highways England has developed a vehicle to help replace overhead highway signs that it says will reduce the need to close lanes and roads during work

The vehicle uses a hydraulic scissor lift similar to that seen on catering vehicles that load food into the hold of airplanes at airports. Traditionally, signs are taken down and installed using a flatbed truck, crane and cherry picker, taking up to 40 minutes. However, the Maintenance Assistance Vehicle (MAV) can do this in around 20 to 25 minutes by using a small jib crane which is part of the vehicle.

Road workers have trialled the MAV and have had to shut down fewer lanes for the operation. Highways England said the device provides a safer environment for workers because they are standing on a sturdy platform.

Once the platform is raised to the required working height, the jib crane attaches to the sign on the gantry and lifts it off.  Operatives then detach the sign, place it onto a trolley on the platform and wheel it into the main compartment of the vehicle. The procedure is reversed when installing an electronic sign.

The hydraulically powered scissor lift enables the signs, which are often found on smart motorway gantries, to be serviced at heights of up to 8.5m and in wind speeds of up to nearly 50kph. CCTV cameras enable the MAV driver to park the vehicle in the correct place below the gantry before any maintenance takes place and monitor operatives working at the back.

Highways England said it is examining the best way for its contractors to purchase the machines. It is estimated that if the device were widely adopted it could save up to €5 million a year. Consideration is also being given as to whether it could be used to improve safety for other duties on England’s motorways and major A roads.

For more information on companies in this article

Related Content

  • Norway's bridge meets tough environmental targets
    February 27, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Road user charging, the way to highway investment?
    February 27, 2012
    Tough political decisions have to be made to ensure highway investment - *Dr Max Lay reports
  • Road user charging, the way to highway investment?
    April 12, 2012
    Tough political decisions have to be made to ensure highway investment - *Dr Max Lay reports Our road systems and how we use them have changed dramatically over the last few centuries, and yet some problems persist and others reappear. For most of human history roads have been used by foot traffic and by cumbersome wagons hauled at walking pace. Roads were built to provide some obvious advantage in commerce or conquest. They were then grudgingly maintained by those who might gain some advantage from the
  • New junction designs for Nairobi to cut congestion
    June 30, 2014
    New junctions could cut chronic congestion in Kenyan capital Nairobi – Shem Oirere reports Kenya plans to replace all T-junctions in the country’s capital Nairobi with acceleration and deceleration lanes to address a crippling vehicle traffic regime estimated to consume $580,000 daily. “We will replace the junctions with acceleration and deceleration lanes,” said John Mosonik, the principal secretary in Kenya’s ministry of transport. He said the acceleration lanes, which allow cars joining the main road t