Skip to main content

Highways England launches Maintenance Assistance Vehicle - MAV

Highways England has developed a vehicle to help replace overhead highway signs that it says will reduce the need to close lanes and roads during work The vehicle uses a hydraulic scissor lift similar to that seen on catering vehicles that load food into the hold of airplanes at airports. Traditionally, signs are taken down and installed using a flatbed truck, crane and cherry picker, taking up to 40 minutes. However, the Maintenance Assistance Vehicle (MAV) can do this in around 20 to 25 minutes by usin
July 7, 2016 Read time: 2 mins
Easier access with the MAV from Highways England
8100 Highways England has developed a vehicle to help replace overhead highway signs that it says will reduce the need to close lanes and roads during work

The vehicle uses a hydraulic scissor lift similar to that seen on catering vehicles that load food into the hold of airplanes at airports. Traditionally, signs are taken down and installed using a flatbed truck, crane and cherry picker, taking up to 40 minutes. However, the Maintenance Assistance Vehicle (MAV) can do this in around 20 to 25 minutes by using a small jib crane which is part of the vehicle.

Road workers have trialled the MAV and have had to shut down fewer lanes for the operation. Highways England said the device provides a safer environment for workers because they are standing on a sturdy platform.

Once the platform is raised to the required working height, the jib crane attaches to the sign on the gantry and lifts it off.  Operatives then detach the sign, place it onto a trolley on the platform and wheel it into the main compartment of the vehicle. The procedure is reversed when installing an electronic sign.

The hydraulically powered scissor lift enables the signs, which are often found on smart motorway gantries, to be serviced at heights of up to 8.5m and in wind speeds of up to nearly 50kph. CCTV cameras enable the MAV driver to park the vehicle in the correct place below the gantry before any maintenance takes place and monitor operatives working at the back.

Highways England said it is examining the best way for its contractors to purchase the machines. It is estimated that if the device were widely adopted it could save up to €5 million a year. Consideration is also being given as to whether it could be used to improve safety for other duties on England’s motorways and major A roads.

For more information on companies in this article

Related Content

  • Amey’s hard-hitting safety DVD supports Highways Agency Safety Week
    October 21, 2013
    Amey is playing a leading role in the fight for zero harm at road works sites with the launch of a hard-hitting DVD in support of a national radio advertising campaign to coincide with the UK Highways Agency’s ‘Safety Week’ (October 21-27 October 2013). The public and regulated services provider’s DVD ‘Changing Behaviours – What Does It Take?’ features powerful scenes of near misses and accidents on the motorway and is designed to make employees think about what more they can do to make they keep themsel
  • Major project to construct landmark Bay Bridge in California
    October 31, 2012
    Iconic California crossing will offer seismic safety – Adrian Greeman reports A unique single-span single-tower suspension bridge is the iconic centrepiece of a dramatic renewal of the eastern Bay Bridge in California, crossing from San Francisco to Oakland. Tourists in San Francisco sometimes mix up their bridges, identifying as the famous Golden Gate, the double suspension bridge which runs across the wide San Francisco Bay. These serially linked bridges in fact form the Bay Bridge east to Oakland whereas
  • US$600 million for Cape Fear bridge replacement?
    February 14, 2024
    An estimate of up to US$600 million has been suggested for North Carolina’s Cape Fear bridge replacement.
  • London’s transportation network requires revolutionary approach to build capacity
    November 13, 2015
    London requires a radical new strategy to delivering the transportation development the city will need to cope with its fast growing population. Martin Tugwell, Transport Programme Director for England’s Economic Heartland Strategic Alliance said, “A road network fit for the world’s fifth largest economy cannot be planned from London: it is time for a revolution in approach, one that is focused on meeting our needs.”