Skip to main content

High-reach demolition guidance

The National Federation of Demolition Contractors (NFDC) has published a revised edition of its landmark ‘Guidance Notes on the Safe Use of High Reach Demolition Excavators’. The latest guidance notes come five years after NFDC published the world’s first ‘Guidance Notes on the Safe Use of High Reach Demolition Excavators’.
June 20, 2012 Read time: 2 mins
The 1644 National Federation of Demolition Contractors (NFDC) has published a revised edition of its landmark ‘Guidance Notes on the Safe Use of High Reach Demolition Excavators’. The latest guidance notes come five years after NFDC published the world’s first ‘Guidance Notes on the Safe Use of High Reach Demolition Excavators’.

Researched and produced by the NFDC’s publications team in conjunction with all the world’s leading high reach excavator manufacturers, the new publication reflects the changes that have taken place in the high reach demolition sector in the past five years. “Since we published the original document, we have seen high reach machines go beyond the 60, 70 and even 90metre working height mark. It was important that the guidance was brought up to date to reflect those changes,” said co-author and industry veteran Paul Brown.

NFDC chief executive Howard Button, who oversaw the creation of the new guidance, added: “A key change to the guidance relates to the pre-start check to both the machine and, equally importantly, to the site itself. Unseen voids and hidden basements are probably the biggest threat to high reach safety.”

For more information on companies in this article

Related Content

  • Minimising the problems of construction disputes
    September 30, 2013
    *Nigel Grout discusses methods for minimising the risk of potential legal issues in construction projects Disputes and the construction industry are synonymous with each other. In a climate of economic downturn, the prevalence of major disputes will continue to be high as parties are unwilling or not able to compromise to reach a settlement. According to the latest ‘Global Construction Disputes’ report by EC Harris, the global average value of a construction dispute in 2012 was nearly US$32 million.
  • Caterpillar Machines will be Built in China
    October 16, 2013
    Caterpillar is focussing on developing solutions for key markets with machine designed specifically for China and built in its Chinese manufacturing operations. The new Caterpillar machines being introduced at BICES include the M
  • Bentley’s Be Inspired Awards highlight innovation in software use
    January 6, 2015
    Innovation, from design to on-site execution, is alive and well, thanks to a good helping of software application. David Arminas reports from software developer Bentley’s annual global conference, held this year in London Successful project delivery is increasingly about hard men and women using software to get the job done and this year’s global conference in London by US-based software developer Bentley highlighted some innovative - and startling - examples. As usual, the Year in Infrastructure 2014
  • What lies beneath Down Under
    January 11, 2021
    The third and final construction stage on Sydney’s WestConnex project has begun, including the underground Rozelle Interchange – with a lot of help from Komatsu