Skip to main content

Half a protest

A British man cut his own car in half as a protest after being fined for having it parked illegally on the road, despite the fact that it was in his own driveway at the time. One wheel of the vehicle had been protruding onto the pavement (sidewalk) by a mere 50mm and the car had been registered by its owner as being off-road, without the annual license duty being paid. However when the man returned from work he discovered that it had been clamped and was told by the authorities that it would be towed away.
July 30, 2012 Read time: 2 mins
A British man cut his own car in half as a protest after being fined for having it parked illegally on the road, despite the fact that it was in his own driveway at the time. One wheel of the vehicle had been protruding onto the pavement (sidewalk) by a mere 50mm and the car had been registered by its owner as being off-road, without the annual license duty being paid. However when the man returned from work he discovered that it had been clamped and was told by the authorities that it would be towed away. He responded by taking a circular saw and cutting it in half, saying that the authorities were welcome to take the rear end of the vehicle. The fire brigade and police were called as the vehicle caught fire during the cutting process but the fire was quickly put out and the police declined to intervene.

Related Content

  • Reality check: Topcon’s Aptix
    July 20, 2023
    The biggest challenge facing construction professionals and general contractors is disconnected data and/or siloed data sources. The recently launched Aptix integration platform has broken down these silos, explains Topcon’s Scott Langbein.
  • In the fast lane at Indian F1 track
    June 21, 2012
    India’s new Formula 1 motor racing circuit, with its tight construction tolerances, demands considerable driving skill. More than 500 million people worldwide watched the first Formula 1 motor race in India's history. The drivers were thrilled by the new asphalt circuit with its numerous bends and the peripheral area around the new race track at Greater Noida near the capital New Delhi, which were built by machinery from German company Vögele (a member of the Wirtgen Group). Working with four Super 1800-
  • Highways England: new agency with long-term investment strategies
    August 18, 2015
    Highways England, created out of the old Highways Agency, was set up on April 1 to oversee a closer relationship between government client and private contractors. World Highways went to a recent forum in London to hear both sides declare their hopes and challenges. Government reforms are often met with a certain amount of scepticism thanks to years of disillusionment over forgotten ministerial promises. Given that, highway contractors in the UK could have been forgiven if they had raised their eyes skyward
  • State of the art tunnel a conservation triumph
    May 2, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports