Skip to main content

Doka’s UniKit is a quick way to support heavy concrete pours

Doka’s new UniKit is a modular shoring system for heavy civil engineering applications. Designed to be quick and easy to erect in a number of different configurations, UniKit provides a steel-girder like structure which can support loads from bridge deck or beam concrete pours. “It’s an efficient way to construct infrastructure without stopping existing infrastructure – such as roads – running underneath,” said Doka’s director of research and development Johann Peneder.
April 19, 2016 Read time: 1 min
UniKit: a quick way to support heavy concrete pours
203 Doka’s new UniKit is a modular shoring system for heavy civil engineering applications. Designed to be quick and easy to erect in a number of different configurations, UniKit provides a steel-girder like structure which can support loads from bridge deck or beam concrete pours.

“It’s an efficient way to construct infrastructure without stopping existing infrastructure – such as roads – running underneath,” said Doka’s director of research and development Johann Peneder.
All videos

For more information on companies in this article

Related Content

  • Günter Papenburg’s versatile asphalt plants
    March 2, 2016
    Günter Papenburg is now offering a range of highly versatile and mobile asphalt batching plants. These plants are designed for ease of transportation as they come in standard shipping containers and can be set up in just 1-2 weeks on site according to the firm. The firm’s Rapid plants are available in two basic variants, with outputs of 140tonnes/hour and 180tonnes/hour. Customers can also specify from a range of options including hot storage or different hopper configurations. The plants can be supplied wi
  • Günter Papenburg’s versatile asphalt plants
    January 6, 2017
    Günter Papenburg is now offering a range of highly versatile and mobile asphalt batching plants. These plants are designed for ease of transportation as they come in standard shipping containers and can be set up in just 1-2 weeks on site according to the firm. The firm’s Rapid plants are available in two basic variants, with outputs of 140tonnes/hour and 180tonnes/hour. Customers can also specify from a range of options including hot storage or different hopper configurations. The plants can be supplied wi
  • Zhejiang Jiashao Bridge Investment & Development Co
    April 6, 2017
    Located in Zhejiang Province of China, Jiashao Bridge spans the Qiantang River and connects the cities of Jiaxing and Shaoxing. The total length of the bridge project is 10.14km and carries an eight-lane expressway The Qiantang River suffers from a high flow rate of up to 7.5m/s. As the tidal range is around 7-9m, the water depth is less than 2m in time of low level tide, so ships can only move at high tide and large scale ship-lifting equipment cannot be used downstream of Jiashao Bridge. However, to
  • Kögel is offering tough and lightweight tipping trailers
    March 14, 2013
    Heavy equipment trailer specialist Kögel has developed two novel tipper trailers, featuring two and three axles.The two axle tipper trailer offers a load volume of 24m³ or 27m³ with a 4mm-thick Hardox 450 base and side walls made from aluminium. The advantage of the steel base with lightweight walls means that it can be used continuously for more than 10 years, while an aluminium trough would need repairs every two to three years.