Skip to main content

Crossing the line

A cyclist in the UK has been sought after a very close call at a rail crossing. The barriers had dropped and warning lights were flashing when the cyclist rode up on his bicycle. Rather than waiting, the impatient cyclist hoisted his bicycle over the barrier and attempted to cross. Another person waiting at the crossing shouted concernedly that the man should wait but received an earful of abuse in return. At that point a train passed through the crossing, its driver seeing the cyclist and sounding his horn
October 12, 2017 Read time: 1 min

A cyclist in the UK has been sought after a very close call at a rail crossing. The barriers had dropped and warning lights were flashing when the cyclist rode up on his bicycle. Rather than waiting, the impatient cyclist hoisted his bicycle over the barrier and attempted to cross. Another person waiting at the crossing shouted concernedly that the man should wait but received an earful of abuse in return. At that point a train passed through the crossing, its driver seeing the cyclist and sounding his horn. The impatient cyclist managed to avoid being hit by the train by a few centimetres, although the train driver has since had to have counselling due to the incident.

Related Content

  • Analysing intelligent speed adaptation benefits
    February 22, 2012
    Oliver Carsten, Professor of Transport Safety at the Institute for Transport Studies (ITS) at the University of Leeds, UK, discusses Intelligent Speed Adaptation, looking at its safety potential
  • Doka formwork rises above the Orinoco River in Venezuela
    July 8, 2016
    Taking a road and rail link across one of the biggest rivers in South America, together with its swamps and flood-plain, called for a new crossing of truly superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River, at Caicara del Orinoco, in Venezuela took shape with a formwork solution and automatic climbing technology from Doka. The bridge has an overall length of just over 11km and the main bridge is nearly 2.3km long with the roadway 55m above the river. The two ident
  • Parking problem in the UK
    August 23, 2016
    One car owner in the UK received an unwelcome surprise when he returned to his car. He had left the vehicle, despite the presence of numerous signs, in a parking area that was closed for maintenance work. The repair crew were working to a tight timeframe and were understandably reluctant to stop operations for just one selfish motorist. Instead, they resurfaced the area around the car, leaving it marooned in a small patch and surrounded on all sides by slowly cooling asphalt. To make matters worse for the d
  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g