Skip to main content

Crossing the line

A cyclist in the UK has been sought after a very close call at a rail crossing. The barriers had dropped and warning lights were flashing when the cyclist rode up on his bicycle. Rather than waiting, the impatient cyclist hoisted his bicycle over the barrier and attempted to cross. Another person waiting at the crossing shouted concernedly that the man should wait but received an earful of abuse in return. At that point a train passed through the crossing, its driver seeing the cyclist and sounding his horn
October 12, 2017 Read time: 1 min

A cyclist in the UK has been sought after a very close call at a rail crossing. The barriers had dropped and warning lights were flashing when the cyclist rode up on his bicycle. Rather than waiting, the impatient cyclist hoisted his bicycle over the barrier and attempted to cross. Another person waiting at the crossing shouted concernedly that the man should wait but received an earful of abuse in return. At that point a train passed through the crossing, its driver seeing the cyclist and sounding his horn. The impatient cyclist managed to avoid being hit by the train by a few centimetres, although the train driver has since had to have counselling due to the incident.

Related Content

  • VIDEO: Cycle parking at the office is getting easier
    September 7, 2015
    Highway designers are increasingly asked to integrate cycle lanes and paths into their projects in major urban areas. And many commuting cyclists are grateful for it, too. But what happens when the cycle path ends, even if it is right outside the rider’s destination, such as his or her work place, be it an office building or factory? That last few metres are essential for completing the perfect commute. This means being able to park the bicycle in a secure environment.
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap
  • Powered two wheeler safety plan for Europe
    November 16, 2015
    A new road safety strategy for powered two wheelers in Europe has been set out jointly following discussions. The results of analysis have been set out in a joint position statement by the bodies FEMA, FIM and FIM Europe. In the draft report FEMA and FIM have identified seven major areas of great importance that are in accordance with the positions of the riders’ organisations in Europe and elsewhere. Key recommendations and statements from the OECD-ITF draft report highlight issues for the safety of powe
  • Bridge under discussion for UK's Thames River
    March 22, 2012
    Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.