Skip to main content

BIM pilot project for Peri in Germany

Peri is showcasing one of its latest contract wins on its stand at bauma 2016 as part of a focus on projects which aims to demonstrate the company’s wider capabilities. The formwork specialist recently won a contract with joint venture contractor Max Bögl / Porr on the Filstal railway bridge, a pilot project for the use of building information modelling (BIM). The Filstal bridge, which is on the new high-speed line between Stuttgart and Ulm, is one of four projects chosen by Germany’s Federal Ministry of Tr
April 12, 2016 Read time: 2 mins
The Filstal railway bridge is one of four BIM pilot infrastructure projects in Germany

298 Peri is showcasing one of its latest contract wins on its stand at bauma 2016 as part of a focus on projects which aims to demonstrate the company’s wider capabilities. The formwork specialist recently won a contract with joint venture contractor Max Bögl / Porr on the Filstal railway bridge, a pilot project for the use of building information modelling (BIM).

The Filstal bridge, which is on the new high-speed line between Stuttgart and Ulm, is one of four projects chosen by Germany’s Federal Ministry of Transport and Digital Infrastructure (BMVI) to investigate the benefits of BIM. The foundations for the bridge are in place, with Peri currently working on the designs for the pier formwork.

Used to some extent in markets including the UK and US, BIM is a fast-developing technology that Peri expects to spread to other global markets. “BIM is a big topic for us: in the future companies will use BIM technology more and more,” said Peri marketing specialist Martina Pankoke.
Peri’s head of engineering tools & innovation, Jochen Köhler, hopes that BIM will help improve safety as well as bringing time efficiencies through clash detection, which is a more generally understood benefit of BIM. “We want to provide a check list for the climbing formwork so that the person responsible knows exactly what needs to be checked before anyone goes on that scaffold,” said Köhler.

The BIM safety feature would see information such as a check list, assembly information and a sign-off form attached to the BIM model. Other related developments could include the use of QR codes on bespoke elements that would inform the formwork contractor where the element should go, and how it would be installed.

Köhler sees the shift from current practices to the use of BIM as a significant one, comparable to the move from hand-drafted designs to CAD.

“We don’t know how we will be working with BIM in five years, no one knows, but we do know that we have to start now,” he concluded.

For more information on companies in this article

Related Content

  • GPS control delivers more accurate compaction performance
    July 13, 2012
    The latest compaction technology offers users the benefits of more accurate performance by combining heat detection and compaction metering with GPS In Europe several leading manufacturers now offer more accurate compaction technology, with Ammann, BOMAG, Dynapac and Hamm all having developed advanced control packages. The technologies vary widely but the advantages are broadly similar, with smart compaction allowing the user a greater degree of control over the compaction process and delivering major reduc
  • Ambitious road tunnelling projects around the world
    November 29, 2013
    The construction of the world’s longest subsea road tunnel in Norway and a vital new link under the Bosphorus Strait in Turkey are among a host of exciting, major road tunnel-based projects currently being undertaken across the globe. Guy Woodford reports Sandvik DTi series tunnelling jumbos are being used for the excavation of Solbakktunnel, set to become the world’s longest subsea road tunnel.
  • Roadtec bullish with strong results
    February 21, 2017
    Roadtec says that it saw a strong financial performance in 2016 and has high hopes for 2017. Part of Astec Industries, Roadtec says that it finished 2016 exceeding its sales performance goals. The firm says that the asphalt paving market benefited from the passage of the 6-year FAST-ACT Highway Bill on December 4th, 2015. Astec Industries and Roadtec played important roles in an industry-wide campaign calling for US legislators urging them to pass the bill. “Through these efforts and many others in our i
  • Lochkov bridge construction time 'cut'
    July 17, 2012
    As part of the R1 southern orbital motorway around the Czech capital, Prague, a joint venture is building a five-span, 461m long and approximately 65m high viaduct near the village of Lochkov, as a girder bridge construction. For the two steeply inclined twin piers, Doka has supplied an automatic climbing formwork solution that obviates the need for shoring and that will "cut more than 100 days from the construction period." Cast-in-place concrete construction of bridge piers with such a steep inclination