Skip to main content

Bear in the sights

A touring cyclist in Canada recently received the benefit of a new training tool while out on a long ride. The cyclist was slowly pedalling up a long climb on his heavily laden bicycle. A bear spotted the solo rider, and deciding that this presented a meal opportunity, hopped over the guardrail and ambled quietly after the rider. Luckily for the cyclist, a driver in a pick-up truck spotted what was happening and placed his vehicle in-between the animal and the bicycle, while also sounding his horn.
October 12, 2017 Read time: 2 mins

A touring cyclist in Canada recently received the benefit of a new training tool while out on a long ride. The cyclist was slowly pedalling up a long climb on his heavily laden bicycle. A bear spotted the solo rider, and deciding that this presented a meal opportunity, hopped over the guardrail and ambled quietly after the rider. Luckily for the cyclist, a driver in a pick-up truck spotted what was happening and placed his vehicle in-between the animal and the bicycle, while also sounding his horn. The cyclist meanwhile looked around and saw what was happening, then picked up his pace somewhat. Another pick-up truck driver also then placed his vehicle between the animal and the cyclist, helping to further protect the rider. The cyclist was able to escape unharmed and the disappointed bear ambled away, looking for another easy meal instead.

Related Content

  • The use of telematics in construction machines is growing
    May 20, 2015
    Demand for telematics technology is growing, as equipment users begin to lean the value of these systems – Alan Dron reports With construction projects increasingly operating to wafer-thin profit margins, any technological assistance that can keep the accounts in the black is welcome. This is particularly the case with those projects where contractors can share a larger slice of the profits if they complete their work ahead of schedule. The downside, of course, is that they also share the pain if the
  • Swiss roundabout goes underground
    February 7, 2012
    The Swiss, well-known for their tunnel constructions, have enhanced their reputation with the recent Gotthard Tunnel breakthrough which has created the world's longest tunnel. And in Bern, a roundabout is being re-positioned almost 10m under the ground, which will transform a somewhat dismal road intersection into an attractive gateway to the country's capital. PERI provided a comprehensive formwork solution for the realisation of the massive beams, reinforced concrete slab along with the conically-sh
  • Arched bridge challenge over the Oparno
    February 29, 2012
    For environmental reasons planners decided in favour of the challenging task of constructing a 13-field arched highway bridge over the Oparno Valley in the Bohemian area of the Czech Republic. The 258m bridge, whose reinforced concrete arch has a span of 135m, straddles the valley without any bridge piers, transferring the loads in the form of compressive forces into the foundations.
  • Winter maintenance challenge
    February 29, 2012
    Many countries had their most severe winter for years, but it could have been much worse without the right equipment and technology as Patrick Smith reports. As many countries faced up to the 2010-2011 winter, hard-pressed maintenance teams did their best to keep things moving on the roads. With some of the lowest temperatures and heaviest snowfalls on record, the UK, Republic of Ireland, Switzerland, France, Scandinavia, Germany, and Belgium were among those affected. Russia, eastern Europe and the USA did