Skip to main content

Zoomlion develops record-breaking tower crane

Zoomlion has set another world record, this time for one of its latest tower crane models. The new T3000 has now been officially recognised as the world’s largest topless tower crane, and authenticated by the Guinness World Records. The machine was unveiled earlier this year in an event held at Zoomlion’s Changde Industrial Park and was introduced by Zoomlion vice president and general manager of the company’s crane division, Huang Qun, and the director of the China Construction Machinery Test Centre Ceng S
October 21, 2014 Read time: 2 mins
Zoomlion now offers the world’s largest flat top tower crane
1175 Zoomlion has set another world record, this time for one of its latest tower crane models. The new T3000 has now been officially recognised as the world’s largest topless tower crane, and authenticated by the Guinness World Records. The machine was unveiled earlier this year in an event held at Zoomlion’s Changde Industrial Park and was introduced by Zoomlion vice president and general manager of the company’s crane division, Huang Qun, and the director of the China Construction Machinery Test Centre Ceng Shun’an. Guinness World Records authenticator Chen Dong declared the T3000 to be the world’s largest topless tower crane and issued the certificate.

The T3000 can lift a maximum weight of 160tonnes, has a maximum lifting moment of 31,200kNm and maximum working radius of 85m. It also features a cross-sectional area and base that are small and is said to be easy to erect and dismantle. Zoomlion introduced topless tower crane technology from German company JOST in mid-June 2011, integrating the technology and using this move as a base for extensive product development of its range.

For more information on companies in this article

Related Content

  • Michelin offers hard-wearing crane tyre at Conexpo
    January 6, 2017
    Michelin says that its X-Crane tyre range offers greater wear life in a tough working environment. This range is designed for use on large, all-terrain mobile cranes with two cabs, up to 10 drive and steer axles, and lifting capacities of up to 1,200tonnes. The Michelin X-Crane can cope with a maximum speed of 80km/h and can handle driving for long distances on and off the road, as well as manoeuvring in confined spaces. The company says it has improved the geometry of the tyre/rim contact area. This makes
  • Michelin offers hard-wearing crane tyre at Conexpo
    January 16, 2014
    Michelin says that its X-Crane tyre range offers greater wear life in a tough working environment. This range is designed for use on large, all-terrain mobile cranes with two cabs, up to 10 drive and steer axles, and lifting capacities of up to 1,200tonnes. The Michelin X-Crane can cope with a maximum speed of 80km/h and can handle driving for long distances on and off the road, as well as manoeuvring in confined spaces. The company says it has improved the geometry of the tyre/rim contact area. This makes
  • German Chinese partnership deal struck at senior level
    November 5, 2015
    Chinese premier Li Keqiang and German chancellor Merkel recently witnessed a strategic agreement between XCMG and SAP Software. The two political leaders were present when XCMG chairman Wang Min and SAP Software vice president and managing director of Greater China Li Qiang signed a strategic cooperation agreement. This formed a major part of the signing ceremony for Sino-German Economic & Trade Cooperation Projects held at Shangri-La Hotel in Hefei, capital of east China's Anhui Province.
  • Metso expand NW Rapid crusher line-up
    November 28, 2018
    Metso is introducing new higher capacity models to its popular wheel-mounted Metso NW Rapid series. In addition to the bigger jaw crusher model, the NW Rapid units are now also available with a variety of most robust cone crushers, including the first model with the MX crusher. Easily transportable using standard prime movers, over 1,000 NW Rapid models have already been sold. Planning a crushing and screening process can typically take months. Additionally, it's often difficult for aggregates producers