Skip to main content

Work is on track with the Sluiskill Tunnel in the Netherlands

Work is progressing well in the Province of Zeeland in the Netherlands to construct the new Sluiskill Tunnel. This project forms part of a plan to develop the region alongside the Ghent-Terneuzen canal. The tunnel project was commissioned by the BV Kanaalkruising Sluiskil (BV KKS), the Combinatie BAM-TBI (CBT), a consortium comprising BAM Civiel, Wayss & Freytag Ingenieurbau, Croon Elektrotechniek and Mobilis. Construction of the Sluiskil Tunnel under the canal commenced in early 2011 and the twin tubes eac
January 2, 2013 Read time: 2 mins
Work is progressing well in the Province of Zeeland in the Netherlands to construct the new Sluiskill Tunnel. This project forms part of a plan to develop the region alongside the Ghent-Terneuzen canal. The tunnel project was commissioned by the BV Kanaalkruising Sluiskil (BV KKS), the Combinatie BAM-TBI (CBT), a consortium comprising BAM Civiel, Wayss & Freytag Ingenieurbau, Croon Elektrotechniek and Mobilis. Construction of the Sluiskil Tunnel under the canal commenced in early 2011 and the twin tubes each measure 1.3km long. When complete the tunnels will connect the eastern and western banks of the canal and the project includes upgrading adjoining roads to increase their capacity. Other work includes the construction of fly-overs and a fast link to the A58 motorway to the north and the Belgian road system to the south.

When this twin tube tunnel is complete, it will reduce congestion at the existing bridge over the canal at Sluiskil. This bridge has to open for shipping around 23 times/day to allow vessels to pass, resulting in huge holdups for road traffic. A further reason the Province of Zeeland is building the tunnel is to support planned economic expansion of the region around Terneuzen.

Related Content

  • Bridge deck launched for the New Wear Crossing, Sunderland (Video)
    March 30, 2017

    The 300m bridge deck of Sunderland’s New Wear Crossing has been successfully launched across the river.

    The 4,750tonne concrete and steel deck was resting on the south side of the River Wear from where it was inched across to touch the north side in a 20-hour operation. It had to slide through the twin arched towers of the bridge’s double pylon on its way to its final position to connect the city regions of Pallion to the south and Castletown to the north.

  • Work starting on Norway’s mega-tunnel project
    January 5, 2018
    Construction is now commencing on Norway’s Rogfast tunnel mega-project on the E39 route between Bergen and Stavanger. The project will cost around €1.8 billion to construct according to some estimates. The new project will set several world records as it will be the longest and deepest undersea road tunnel ever constructed, measuring 27.3km and reaching a maximum 392m below the sea bed. Once the new tunnel opens to traffic in 2025 or 2026 it will reduce the travel time between Bergen and Stavanger, in the
  • Alberta’s peaceful partnership
    May 4, 2020
    A bridge project in northern Canada threw up some unexpected challenges, reports David Arminas, from the banks of the Peace River in Alberta
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno