Skip to main content

Work is moving ahead on the new bridge connecting Laos and Thailand and spanning the Mekong River

Plans are well in hand for the fourth Laos-Thai Friendship Bridge connecting Laos with Thailand. The bridge is expected to be complete by 2014 and spans the Mekong River between Thailand's Chiang Rai province and Laos' Bokeo province. The two countries have also reached an agreement for the fifth Lao-Thai Friendship Bridge, which will span from Thailand's Bung Kan province to Laos' Bolikhamsay province.
April 3, 2012 Read time: 1 min
Plans are well in hand for the fourth Laos-Thai Friendship Bridge connecting Laos with Thailand. The bridge is expected to be complete by 2014 and spans the Mekong River between Thailand's Chiang Rai province and Laos' Bokeo province. The two countries have also reached an agreement for the fifth Lao-Thai Friendship Bridge, which will span from Thailand's Bung Kan province to Laos' Bolikhamsay province.

Related Content

  • Highway projects for China’s Yunnan Province
    May 5, 2020
    Three highway projects are being planned for China’s Yunnan Province.
  • India pushing ahead with infrastructure projects
    July 4, 2012
    Despite the economic downturn, India looks to be pressing ahead with its major infrastructure projects to further boost its incredible growth. Patrick Smith reports India, which like most countries has been affected by the current economic climate, although not to the same extent, is pressing ahead with its ambitious highway construction plans. Each week new projects are completed, started or awarded as the nation seeks to improve its transportation requirements. These are needed to meet the aspirations of
  • New Clyde bridge project
    March 12, 2021
    A New Clyde bridge project is going ahead.
  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for