Skip to main content

Work on key section of new Oman highway cancelled

The Oman Government has cancelled work on Package Two of the Batinah Expressway project. This was for a 45km section of highway worth US$327 million. The eight lane highway was to have been built over a three year period. It is not clear when work will recommence and whether or not the original firms involved will be re-engaged but under different terms.
April 12, 2013 Read time: 1 min
The Oman Government has cancelled work on Package Two of the Batinah Expressway project. This was for a 45km section of highway worth US$327 million. The eight lane highway was to have been built over a three year period. It is not clear when work will recommence and whether or not the original firms involved will be re-engaged but under different terms.

Related Content

  • State-of-the art road tunnels in construction and use of ITS
    April 25, 2013
    A wealth of major road tunnel construction projects and significant cant ITS installations within existing key road tunnels have been recently completed or will soon be underway. Guy Woodford examines some of them. A state-of-the art Tunnel Boring Machine (TBM) - the 10th largest ever to be built worldwide will be put to work later this year on New Zealand Transport Agency’s landmark Waterview Connection project in Auckland. The giant Herrenknecht-manufactured machine will be used to construct the twin 2.5
  • New Chinese link
    February 28, 2012
    Chinese firm Jiangsu Expressway Company is to invest a healthy US$600 million in the Kunshan-Wujiang section of the Changshu-Jiaxing Expressway.
  • Alberta funds more upgrades near Edmonton
    April 12, 2021
    The Canadian province will move ahead with work on Highway 15 and 19.
  • Three Colombian bridge projects commencing
    January 17, 2019
    In Colombia progress is being seen on three major bridge projects located in different parts of the country. Construction of the new Pumajero Bridge is well in hand and is expected to be complete before the end of 2019. The new PumajeroBbridge will be 2,247m in length and have 990m of viaduct connections and access, as well as two three-lane carriageways on each side. Once the new bridge is open to traffic, the old cable-stayed concrete link between Baranquilla and Sitionuevo will be demolished. The new