Skip to main content

Work begins on Vietnam’s Long Van-Long My road project

Work has begun on the Long Van-Long My road in Vietnam's Binh Dinh province. The US $47.71 million project (VND 995bn), due for completion in 2015, will create a 7km road connecting National Highways 1D and 1A in Quy Nhon town.
August 28, 2012 Read time: 1 min
Work has begun on the Long Van-Long My road in Vietnam's Binh Dinh province.

The US $47.71 million project (VND 995bn), due for completion in 2015, will create a 7km road connecting National Highways 1D and 1A in Quy Nhon town.

Related Content

  • Vietnam elevated road works planned
    January 14, 2021
    A series of elevated road works is being planned for Ho Chi Minh City in Vietnam.
  • Boom in Asian infrastructure investment
    February 8, 2012
    Investment in China and India continues unabated, but other nations on the continent are eager to attract companies as Patrick Smith reports Asia is still booming despite the current economic crisis, and new infrastructure programmes are constantly coming on stream. Powerhouses China and India, with their double-digit growth figures and huge infrastructure plans (in scope and cost), are leading the way and are still magnets for businesses wishing to expand, both in terms of facilities and customers. But oth
  • A new bridge for Vietnam’s Ho Chi Minh City
    September 23, 2019
    A new bridge project is being planned for Vietnam’s Ho Chi Minh City (HCMC). The Thu Thiem 4 Bridge will be 2.2km in length and measure 28m wide and has a projected cost of US$223 million. The bridge will span the Saigon River and connect District 2 with Tan Thuan Dong in District 7, featuring three lanes for vehicle traffic in either direction as well as pedestrian facilities. The construction of the bridge is expected to ease journey times in HCMC, which is notorious for its heavy traffic and chronic cong
  • Quang Ninh agrees to SE's new draft for Bach Dang Bridge in Vietnam
    October 18, 2012
    Vietnam's Quang Ninh province has backed a new design proposed by Japanese developer SE Group for the 4.3km Bach Dang Bridge. The new design will change the original prestressed concrete bridge design to a steel cable-stayed bridge. The modification will lower the girder height, reduce the bridge length and alter the main span length. The altered draft is awaiting final approval from the authorities. SE Group has also requested to cut the expenses for the project to US $ 386 million from $ 483 million. The