Skip to main content

VIDEO: Concrete paving - you’ve come a long way, baby!

It’s 1948. The grand scheme of creating an Interstate Highway system in the US is still barely a twinkle in President Dwight Eisenhower’s military eye. Highway construction improved greatly in the late 1950s and early 1960s as the American contractors became more mechanized and therefore efficient at laying roads faster and of better quality. But how did they build a road back then in 1948? Thanks to Encyclopaedia Britannica Films, we have a movie of just how a concrete highway was created. The constr
July 14, 2016 Read time: 2 mins
It’s 1948. The grand scheme of creating an Interstate Highway system in the US is still barely a twinkle in President Dwight Eisenhower’s military eye. Highway construction improved greatly in the late 1950s and early 1960s as the American contractors became more mechanized and therefore efficient at laying roads faster and of better quality.

But how did they build a road back then in 1948?

Thanks to Encyclopaedia Britannica Films, we have a movie of just how a concrete highway was created. The construction site looked more like a chain gang from a nearby prison that a professionally done infrastructure project.

Viewers just might be able to feel the sun’s heat as workers toil into the long day.

If this video piqued your curiosity about road building projects back then, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal click here Visit youtube Page false https://www.youtube.com/watch?v=neaoGclvips false false%> to see a 1951 film from the Bethlehem Steel Company. Things have apparently moved on since 1948 and steel is making inroads. At least this film is in colour.

Related Content

  • Hyundai is launching a top of the range 120tonner
    April 15, 2012
    Hyundai is introducing a new top end excavator in the 100tonne-plus sector. The company says this endorses its commitment to large-scale investment in developing new products and new market opportunities. “Building on Hyundai’s experience with the successful 50-80tonne high capacity models, the all-new 120tonne R1200-9 has been conceived with an eye on the expanding worldwide mining and quarrying sector, where the demand for efficient, large-scale mass excavation in minerals extraction and overburden remova
  • Cost rises again for Columbia’s unfinished La Linea tunnel
    February 3, 2015
    Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel. Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November. The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-B
  • Arja Group offers range of new crushers
    March 11, 2013
    The Arja Group is broadening its range of crushing and screening equipment with its latest generation of impact crushers. The new series TAURO 10 PE models join the range, along with the durable MA 0806 jaw crushers and HN 36-3 screens. The new impact crushers are designed to work with highly abrasive materials and can also be used for soft materials. The firm claims that these impact crushers offer benefits over cone crushers in terms of material shape and reduced fines. The new TAURO 10 PE features advanc
  • New technical centre boosts CMS Cepcor
    January 6, 2017
    Crusher spares specialist CMS Cepcor has opened a new technical centre at Coalville in the UK and has now transferred its Baguley Precision Engineering business into the newly formed Precision Services Division. The company has moved machine servicing from Burton-on-Trent to the new technical centre and retained all the engineering staff. Within the centre is a CNC manufacturing capability, which will enhance the manufacturing, inspection and repair facilities at Coalville.