Skip to main content

Vejdirektoratet finishes €18.75 million LED update

The Danish Road Directorate, Vejdirektoratet, said lower operating costs of LED highway lights mean the return on investment could be only six years.
By David Arminas May 5, 2025 Read time: 2 mins
LED lights and reduced lighting levels is helping the Danish Road Directorate save money and energy (image courtesy Vejdirektoratet, the Danish Road Directorate)

The Danish Road Directorate, Vejdirektoratet, has completed its largest lighting project, replacement of 23,000 lamps on the national road network with modern LED lamps.

Vejdirektoratet also said it has removed lighting on motorway sections where it was deemed not essential. Overall, the project means that energy consumption for road lighting has been reduced by about 65%, according to Thomas Danielsen, Denmark’s transport minister.

Total investment is about €18.75 million. However, the lower operating costs mean that the investment is expected to be paid back in just under six years. At night, the light is automatically reduced to half the previous level in many places to save energy, where there is no need for much brighter light.

Last December, the directorate published an updated version of the Danish Road Lighting Handbook - one of the most used Danish standards to meet the Danish Road Lighting Guidelines and which is heavily adopted for state roads, municipalities and road infrastructure.

The updated handbook introduces three new terms and concepts concerning light pollution, good light and biodiversity. These are “environmental zones”, “G-index” and “mDER (Melanopic Daylight Efficacy Ratio)”.  

Last May 2024, the Danish Road Directorate published the report “The Impact of Lighting on Animals, Plants and Humans.” The report helped form the basis for the measures the directorate incorporated into the updated road lighting handbook.

For more information on companies in this article

Related Content

  • Apps for all in Louisiana
    May 20, 2020
    Jason Barnes* looks at how a system of engagement (SoE) from software specialist Esri helped the US state of Louisiana’s transportation department create user-friendly apps
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • Fehmarnbelt hearings to start
    September 24, 2020
    The Danish-German project has come under financial and environmental criticism.
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.