Skip to main content

US$1.4 billion Malaysia expressway project

Plans are underway for a US$1.4 billion Malaysia expressway project.
By MJ Woof November 7, 2024 Read time: 1 min
The new WISE project in Malaysia will deliver transport improvements – image © courtesy of WISE


Construction of Malaysia’s West Ipoh Span Expressway (WISE) is expected to cost US$1.4 billion. The firm holding the concession for the route, East Coast Road Sdn Bhd (ECRSB), will pay for the project’s construction.

The concession agreement for the 61km route is for a 55-year period and the toll charges have already been agreed also. Construction is expected to take 48 months to complete and when open in 2028, the route will make a significant reduction in congestion on other roads in the area.

According to WISE, “The long-awaited highway spanning from Gopeng to Kuala Kangsar in Perak, will be a strategic asset, driving social, environmental, and economic progress. WISE will unlock countless opportunities, fuelling economic growth and social development, particularly in Perak.

The route runs from Gopeng to Kuala Kangsar, bypassing the winding and steep gradient of the existing North-South Expressway (NSE) which traverses through the Keledang Range in Central Perak. The route has been designed as a dual-three lane expressway with a design speed of 120km/h and a speed limit of 110km/h. The WISE link will utilise modern Multi-Lane Fast Flow (MLFF) tolling technology.

 

Related Content

  • Kathmandu flyover opening
    June 26, 2025
    A new Kathmandu flyover is open to traffic, forming part of the city’s ring road.
  • Malaysian expressway project awarded
    December 15, 2014
    The project to construct Malaysia’s West Coast Expressway deal has been awarded to a major contractor. Under the terms of the deal, the project will be carried out by the IJM-Kumpulan Europlus joint venture. The five year contract is expected to cost in the region of US$1.44 billion to carry out. When complete the new expressway will cut journey times between Taiping and Banting.
  • India’s US$13 billion expressway project
    August 14, 2024
    India’s US$13 billion Delhi-Mumbai expressway project should be complete in 2025.
  • IRF World Congress: Road user charging
    October 16, 2024
    Where will the money come from to develop and maintain tomorrow’s sustainable road network, no mater in what nation? This was the focus of another session at the IRF World Congress in Istanbul of day of the three-day event.