Skip to main content

UK’s cause for concern

Mineral Products Association (MPA) results for the first quarter of 2012 indicate a substantial reduction in sales of aggregates, ready-mixed concrete and asphalt, confirming new GDP figures showing that declining construction activity has triggered the UK’s latest recession. Compared with the same period of 2011, sales volumes of crushed rock and sand and gravel aggregates declined by 13% and 12% respectively in the first three months of 2012, and sales volumes of ready-mixed concrete and asphalt fell by 9
June 25, 2012 Read time: 2 mins
UK’s quarry sector faces continuing low demand for products
5338 Mineral Products Association (MPA) results for the first quarter of 2012 indicate a substantial reduction in sales of aggregates, ready-mixed concrete and asphalt, confirming new GDP figures showing that declining construction activity has triggered the UK’s latest recession.

Compared with the same period of 2011, sales volumes of crushed rock and sand and gravel aggregates declined by 13% and 12% respectively in the first three months of 2012, and sales volumes of ready-mixed concrete and asphalt fell by 9% and 17%. The MPA has said that these products represent by far the largest flow of materials into construction markets and are used extensively throughout the construction sector. The figures follow a slightly positive overall performance in 2011 and suggest that construction activity is now in decline following some recovery from the depths of the recession in 2009.

Jerry McLaughlin, chief economist at MPA, said: “These figures represent real deliveries of materials to construction projects, not opinion survey data, and they indicate that there is a real likelihood that construction activity will fall away and constrain economic recovery as we move through 2012 and 2013.

“There has been some criticism of the ONS [3598 Office for National Statistics] data released on Wednesday (25 April) that showed a 3% first quarter decline in construction compared with the fourth quarter and lower activity than the first quarter of 2011. These official figures are provisional, but they reflect just what our industry is experiencing on the ground."

For more information on companies in this article

Related Content

  • Success of ECED dealers'conference
    May 9, 2012
    ECED's first Dealers' Conference in April during Intermat resulted in "a tremendous success and solid future outlook for the association". The president of the European Confederation of Equipment Distributors (ECED), Dr. José Gameiro, said the gravity of the current crisis is "the worst in the past 50 years, with a devastating effect on equipment distribution for public works and civil construction."
  • Turkey’s important new tunnel will improve transport links
    May 18, 2016
    Major advances in tunnelling will allow cars to travel underneath the Bosphorus sea channel in Turkey's Istanbul next year when its third road link is opened, writes Adrian Greeman. The Bosphorus is redolent with history and strategic significance. As one of the world's most significant sea connections, linking the landlocked Black Sea to the Marmara Sea and the Mediterranean beyond, it has been vitally important for trade and crucial for military access. It is also one of the biggest obstacles for land tra
  • Success of ECED dealers'conference
    April 11, 2012
    ECED's first Dealers' Conference in April during Intermat resulted in "a tremendous success and solid future outlook for the association" The president of the European Confederation of Equipment Distributors (ECED), Dr. José Gameiro, said the gravity of the current crisis is "the worst in the past 50 years, with a devastating effect on equipment distribution for public works and civil construction." Describing the foreseeable consequences for the equipment sector, he estimated that "up to 20-30% of Euro
  • Wopfinger Transportbeton’s efficiency investment
    June 24, 2013
    Wopfinger Transportbeton’s investment in a new sand washing plant at their Eggendorf site in Lower Austria is said to have resulted in a 60% increase in gravel production - from 135tonnes/hour to 220 tonnes/hour. Before the new Evowash sand washing plant was installed, Wopfinger were working two shifts at Eggendorf to meet the capacity requirements of the ready mix concrete plant located at the sand and gravel pit. This has now been reduced to one shift as a result of both the quality and quantity of the wa