Skip to main content

TRL Signals Tour 2013 stretching across the UK

Following on the successful launch last year of TRL Traffic Signals Tour across the UK, TRL Software has announced its Second TRL Traffic Signals Tour 2013. From the 1-16 October 2013, TRL Software will be holding six events in key locations across Britain. The tour will be calling at London, Cardiff, Leicester, Leeds and Glasgow as well as at its Crowthorne headquarters in Berkshire. Feedback from last year’s events was highly positive, providing access to some of TRL’s latest research, the latest product
August 7, 2013 Read time: 2 mins
Following on the successful launch last year of 777 TRL Traffic Signals Tour across the UK, TRL Software has announced its Second TRL Traffic Signals Tour 2013. From the 1-16 October 2013, TRL Software will be holding six events in key locations across Britain.

The tour will be calling at London, Cardiff, Leicester, Leeds and Glasgow as well as at its Crowthorne headquarters in Berkshire.

Feedback from last year’s events was highly positive, providing access to some of TRL’s latest research, the latest product developments and releases, and providing a platform to access key staff involved in SCOOT, MOVA, TRANSYT, TRL’s signals research projects and more.

This year plans to be even bigger and better, with new locations and facilities chosen, new research projects to share, and invited industry experts to present their work, thoughts and news.

TRL will also be reporting on some of its latest work, including a ground breaking new project that aims to Integrate Traffic Control and Air Quality.

Anyone who would like to be part of the TRL Signals Tour 2013 can contact TRL Software on +44 (0) 1344 770 558 or email at %$Linker: 2 Email <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkEmail [email protected] [email protected] false mailto:[email protected] true false%>

Places are strictly limited so it will be on a first come first serve basis.  Registration will open late August.

For more information on companies in this article

Related Content

  • North Viaduct completed on UK’s Mersey Gateway bridge project
    April 19, 2017
    Concrete finishing work has started on the completed north approach viaduct of England’s new 2.13km Mersey Gateway project. Over the past three years, around 18,400m³of concrete was used to build the viaduct. When complete near the end of this year, around 60,000 vehicles are expected to use the toll bridge every day, or nearly 22 million vehicles annually.
  • Sandvik upgrades cone crusher offering
    April 15, 2013
    Sandvik claims that its 18.9tonne CH550 cone crusher offers customers good material shape and low operating costs in a range of material applications. A development of the company’s Hydrocone design, the CH550 can be configured for either secondary or tertiary crushing applications with a wide performance range.
  • Sandvik DC125R is new member of DC hammer drill family
    February 13, 2013
    Sandvik DC125R is a new member to the proven Sandvik DC family of compact, rubber-tyred top hammer drill rigs. The fully remote-controlled, hydraulic and self-propelled mini-sized drilling unit on a four-wheel drive carrier, is for drilling 22–45mm holes, and replaces the former Sandvik DC122R, one in the series of rigs originally launched in 1988 under the product name of Tamrock Commando. “A range of job site tests show that the new model offers better manoeuvrability than ever before. This is thanks to t
  • VIDEO: M6 motorway link taking shape between Knutsford and Bowdon
    August 23, 2016
    In the UK, work to connect sections of the new €223 million A556 Knutsford to Bowdon dual carriageway, between the M6 and M56 in Cheshire, will get underway in earnest at the weekend with the opening of its first bridge.

    The route of the road, forming a link between junction 19 of the M6 motorway at Knutsford and junction 7 of the M56 motorway at Bowdon, has been taking shape for some time.