Skip to main content

Tender opens for SA rapid transport project

The first tranche of tenders for the US$392 million Rustenburg Rapid Transport (RRT) project in the north west of South Africa has been announced by the local municipal council.The tenders are for the construction of the North-West RRT Corridor, topographical and structural survey services and environmental-impact assessment (EIA) services. The RRT aims to provide transport to half-a-million Rustenburg residents from 2015.
April 20, 2012 Read time: 1 min
The first tranche of tenders for the US$392 million Rustenburg Rapid Transport (RRT) project in the north west of South Africa has been announced by the local municipal council.The tenders are for the construction of the North-West RRT Corridor, topographical and structural survey services and environmental-impact assessment (EIA) services. The RRT aims to provide transport to half-a-million Rustenburg residents from 2015.

Related Content

  • Road recycling train from Wirtgen in Nigeria
    March 9, 2022
    The Wirtgen Group has worked with Julius Berger Nigeria (JBN) in Nigeria to deliver a landmark project
  • Nepalese Government pushes ahead with transport infrastructure programme
    July 17, 2014
    The Nepalese Government has announced a major programme of transport infrastructure works for the 2014-2015 period. Road, highway and airport projects have all been prioritised. The detailed project report for the Kathmandu-Tarai Fast Track Road is to be completed within six months. The proposal aims to attract investors by guaranteeing a minimum number of vehicles using the tolled link. The project has been delayed due funding issues. This period will also see work being carried out the Mid-Hills Highway,
  • Flyover removal completed successfully
    February 15, 2021
    A flyover removal project has been completed successfully in the UK.
  • Delay for tender for link roads to Istanbul’s new Bosporus bridge
    June 25, 2015
    The tender process for the road connections to the third bridge over the Bosporus in Turkey has been delayed once more. This is the third time the tender for the connecting roads for Istanbul's third bridge over the Bosporus has been postponed. The tender for the North Marmara Motorway was originally set for 6th March 2015 but was then pushed back to the 6th May. It was then announced that the tender would be run in two stages, with the Kinali-Odayeri motorway tender on 7th July and the Kurtkoy-Akyazi motor