Skip to main content

Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway

A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
August 1, 2013 Read time: 2 mins
A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP).

The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway.

Road capacity along the route will increase to 8,000 vehicles per hour from a current 3,000 vehicles per hour, in a push to mitigate the city increasing traffic jams.

The AVO project was originally conceived of to be the missing link in a beltway that runs around Santiago. As such, it was originally earmarked to span underground north to south for 13km, joining El Salto with the Rotonda Grecia.

However, opposition from inhabitants of the La Reina and Peñalolén districts to the last 4km-stretch of the tunnel pushed the government, which is leaving office in March 2014, to split the project and call a tender only for the first 9.3km stretch.

The responsibility for the AVO's final stretch will pass on to the new elected president. The current government led by Sebastian Piñera will leave office four months after the presidential election takes place in November 2013.

Parties interested in bidding for the first stretch have until November 22 to submit their offers.

Related Content

  • MOP in Panama plans US$700mn road tender for mid-2013
    January 24, 2013
    The Ministry of Public Works (MOP) in Panama will put the rehabilitation and expansion of the 208km Santiago de Veraguas-David road out to tender in mid-2013. The works, part of which will create a larger four-lane highway, have been calculated to cost around US$ 700 million. Since 2009, President Ricardo Martinelli has contracted turn-key projects worth $3.4 billion.
  • Interest is strong in the project to build Chile’s Chacao Bridge
    March 4, 2013
    Strong interest from a wide array of contractors has been shown in the project to construct the Chacao Bridge in Chile. In all some 47 sets of terms and conditions have been sold in the pre-qualification process for the tender to design and construct the Chacao Bridge. When complete the bridge will link Chiloe Island with the mainland of Chile, in the Los Lagos region. Chile’s Ministry for Public Works is now evaluating the companies/consortia that meet the requirements to build the bridge. The contract wil
  • $594 million Chilean highway delayed
    May 6, 2025
    Bidding for a $594 million Chilean highway is delayed.
  • Chile highway tender in 2020
    November 18, 2019
    The tender process will be opened for a new highway project in Chile in early 2020, with technical and economic bids due in the first quarter. The project aims to widen and upgrade the Route 5 stretch connecting the cities of Talca and Chillan in central Chile. The project is expected to cost US$796 million and the route will be offered under a concession package lasting 25 years. The route is run under a concession by ISA Intervial at present, which is due to cease in June 2020.