Skip to main content

Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway

A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
August 1, 2013 Read time: 2 mins
A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP).

The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway.

Road capacity along the route will increase to 8,000 vehicles per hour from a current 3,000 vehicles per hour, in a push to mitigate the city increasing traffic jams.

The AVO project was originally conceived of to be the missing link in a beltway that runs around Santiago. As such, it was originally earmarked to span underground north to south for 13km, joining El Salto with the Rotonda Grecia.

However, opposition from inhabitants of the La Reina and Peñalolén districts to the last 4km-stretch of the tunnel pushed the government, which is leaving office in March 2014, to split the project and call a tender only for the first 9.3km stretch.

The responsibility for the AVO's final stretch will pass on to the new elected president. The current government led by Sebastian Piñera will leave office four months after the presidential election takes place in November 2013.

Parties interested in bidding for the first stretch have until November 22 to submit their offers.

Related Content

  • New Central Ring Road around Moscow to be built by 2018
    September 30, 2013
    Eugene Gerden evaluates Moscow’s new ring road mega project The Russian government plans to complete implementation of one of the most ambitious projects in the country’s road building industry in recent years, which involves construction of The Central Ring Road around Moscow by 2018. The new road should be built by the next presidential elections, while its length will be 339km. It is expected to be comprised of five sections and will be located 50km away from Moscow Ring Road, a ring road encircling the
  • Key Florida highway link wins major award
    July 2, 2014
    A major highway connection project located in Tampa, Florida has won a 2014 Outstanding Project Award from the Florida Department of Transportation (FDOT) and the Florida Institute of Consulting Engineers (FICE). The link was opened in January 2014 and was engineered by designer Atkins. The 1.6km-long I-4/Selmon Connector links I-4 with the Lee Roy Selmon Expressway. The US$425 million Connector now carries over 24,000 vehicles/day, which includes some 2,000 heavy vehicles/day. With the construction of the
  • AEM promotes photo competition
    February 29, 2012
    The Association of Equipment Manufacturers (AEM) is partnersing with the I Make America campaign for a photo competition.
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load