Skip to main content

Slovakian link opening

The second phase of Slovakia's R1 expressway is now opening to traffic.
March 1, 2012 Read time: 1 min
The second phase of Slovakia's R1 expressway is now opening to traffic. The 8.4km section connects Zarnovica and Sasovske Podhradie. The opening was delayed due to heavy snow in late 2009, followed by high water levels. Flooding of the expressway under construction occurred as the section was not properly protected against flooding from the Hron River, which caused delays. The work was originally expected to cost €103.6 million but is increasing by some 5% due to additional work needed to provide better flood protection.

Related Content

  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c
  • Grand achievement for Intermountain
    July 18, 2012
    A versatile solution has helped with a tricky project at the Grand Canyon in the US – Pierre Peltier When Intermountain Slurry Seal, a division of Granite Construction, submitted its bid in 2009 to repair roads and parking lots along the Grand Canyon’s North Rim, the company knew the job would come with challenges. The remote roads leading from Jacob’s Lake, Arizona, to the North Rim Lodge had deteriorated to a point that the Federal Highway Association’s (FHWA) Central Federal Lands (CFL) Highway Division
  • Costs climb for constructing Mexican tunnel
    August 20, 2014
    Climbing costs are afflicting the construction of the key Coatzacoalcos tunnel connection in Mexico. Concesionaria Tunel de Coatzacoalcos is the firm handling the construction and concession for the Coatzacoalcos immersed tunnel. The company claims that costs have climbed 150%, from US$153.23-$383.1 million. Concesionaria Tunel de Coatzacoalcos is controlled by Spanish construction firm FCC Construcciones and says that the climbing costs are caused by delays due to the climate, problems purchasing land and
  • Revenue holds steady for Wacker Neuson in 2016
    March 16, 2017
    Wacker Neuson said that it managed to keep 2016 revenue stable despite challenging market conditions but profitability was impacted by crises in key markets. The company is positive about 2017 and expects revenue and earnings to grow again. Revenue for 2016 was €1.36 billion, up only 0.3% on 2015. Profit was negatively affected by crises in emerging markets and industries as well as a number of one-off effects, the company said. Profit before interest and tax (EBIT) contracted 15% to just over €88