Skip to main content

Six years for Belgrade-Novi Sad highway

Total cost of the 100-km project in Serbia is estimated at €1.6 billion and will be completed by the Chinese company Shandong Hi-Speed Group.
By David Arminas September 17, 2024 Read time: 2 mins
Novi Sad: faster travel times to the historic city are coming (image © Xbrchx/Dreamstime)

Construction of the Belgrade-Zrenjanin-Novi Sad Highway in Serbia is expected to take around six years, according to the Serbian Minister of Construction, Transport and Infrastructure.

Goran Vesic said that the total cost of the 100km project is estimated at €1.6 billion and will be completed by the Chinese company Shandong Hi-Speed Group Corporation working with various Serbian contractors.

Work will include demolition of the existing Sava Bridge, according to a report by the Serbian news agency Tanjug. The 430m-long, 40-wide steel tied arch bridge, which opened in 1942, crosses the River Sava within Belgrade. It is the smallest road bridge in the Serbian capital and is used both for car and tram traffic.

Serbian prime minister Miloš Vučević, who toured the constructions site, said he believes that the work will be completed on time, noting that Shandong Hi-Speed has so far respected deadlines and quality and fulfilled what was agreed upon.

Section one of the project involves construction of 65km of highway between Ovca and Zrenjanin and then section two of 35km between Zrenjanin and Novi Sad, as well as two bridges over the Tamis River, one bridge over the Tisa River and a bridge over the Begei River.

Shandong Hi-Speed Group Corporation or Shandong Gaosu Group, is a solely state-owned enterprise in Jinan, China, owned by the Shandong Provincial People's Government. It is mainly engaged in investment, construction and operation of highways, expressways, bridges, railways, rail transits, harbours, shipping and logistics.

For more information on companies in this article

Related Content

  • Webuild to start on Pedemontana Lombarda
    December 15, 2022
    The new sections of the Pedemontana Lombarda motorway near Milan in northern Italy will deploy smart technology to help with maintenance of the infrastructure and traffic control.
  • $3.2 billion express lanes contract for North Carolina
    July 1, 2025
    A $3.2 billion express lanes contract is opening for bids in North Carolina.
  • Paving an Iowa road
    February 4, 2025
    A slipformer from Power Pavers has been used to pave a road stretch in Iowa.
  • Temporary bridge replacement in the US
    July 2, 2019
    A temporary bridge structure provided by Acrow Bridge is maintaining traffic flow for a key crossing in Vermont. The bascule bridge is allowing both vehicular and vessel traffic to pass during the reconstruction work to the North Hero-Grand Isle Drawbridge in Vermont. The US$60 million project involves replacing the historic twin leaf bascule bridge on Lake Champlain. This modular steel bascule bridge is allowing transport to continue to and from the Lake Champlain island towns of North Hero and Grand Isl