Skip to main content

Sibmost to build first phase of Siberian bridge

Sibmost and the Automobile Roads Department of the Krasnoyarsk Region have signed a US$371.07million (RR12billion) contract to construct the first phase of the fourth highway bridge in Krasnoyarsk, Siberia.
June 8, 2012 Read time: 1 min
5872 Sibmost and the Automobile Roads Department of the Krasnoyarsk Region have signed a US$371.07million (RR12billion) contract to construct the first phase of the fourth highway bridge in Krasnoyarsk, Siberia.

For more information on companies in this article

Related Content

  • Indian highways road construction
    April 16, 2012
    Superlatives, once applied only to China's phenomenal growth, are now being used for India. Patrick Smith reports Those involved with the Naini Bridge in Allahabad are so proud of the result that they have set up an exhibition centre detailing its construction.
  • Breakthrough for Bosnia’s Vranduk Tunnel
    March 7, 2022
    The twin-tube Vranduk Tunnel is being built using the new Austrian tunnel method by Azerbaijan's Azvirt and Hering dd Siroki Brijeg contractors.
  • Strabag-led consortium wins €178 million R2 Slovakia expressway contract
    November 22, 2013
    A consortium led by the European construction group Strabag has signed the €178 million contract to build the 10.4km long section of the R2 expressway between Pstruša and Kriván in Slovakia. The R2 expressway runs through the valley of the Slatina River in central Slovakia and links the cities of Pstruša and Kriván. “After years of restraint in public-sector expenditures, the Slovak construction industry is again beginning to recover. We are bidding for several large contracts that are currently in the t
  • High-tech, high places: 3M in US and MetService in New Zealand
    August 1, 2017
    The US state of Michigan sets up a high-tech test road while New Zealand’s transport officials buy in some high-tech weather forecasting. The road safety division of 3M will provide the US state of Michigan with lane markings and retroreflective signs for a connected vehicle technologies trial along the I-75 highway. Around 5km of the Interstate 75 work zone in Oakland County will be transformed over the next four months to improve safety for drivers and test advanced vehicle-to-infrastructure technologie