Skip to main content

September 2016

Wide clearance is required for some vehicles - image courtesy of Petra Schwimmbeck
November 14, 2016 Read time: 1 min

Wide clearance is required for some vehicles - image courtesy of Petra Schwimmbeck

Related Content

  • Electric asphalt compaction option
    July 20, 2023
    Several asphalt compactor makers now offer compact machines featuring electric drives
  • Laser scanning focuses on asset management
    January 9, 2015
    Laser scanners and improved data collection and analysis software are making light of asset management surveying. David Arminas reports The age of the laser scanner is upon us, taking over from traditional manual methods of surveying, data collection and processing. These new technical developments are making it much easier to process and use the data captured and are providing highways engineers with powerful tools to record, map and visualise their assets. This is good news for highways authorities
  • Trimble’s new drone package offers versatility
    April 26, 2018
    Trimble is now offering a sophisticated new drone package called Trimble Stratus, through the firm’s partnership with drone-mapping and analytics company Propeller Aero. According to Martin Wagener, worldwide product implementation manager for the firm, the system allows the user to employ any type of commercial quality drone. The important part of the package is the Aeropoint, a small flat plate developed by Propellor. This is placed on the ground and acts as a point of reference for all of the drone’s ge
  • Safer bridges
    July 2, 2012
    Barin is supplying a new underbridge inspection platform to a Canadian customer, as well as a unit to a firm in Russia. The ABC190/L for Canada is the first machine Barin has supplied to the country and the customer is rental company Jenik Construction, based in St Mathieu de Veloil. The platform is mounted on a five axle Freightliner M2-112 truck chassis and can operate from a single lane of traffic. It offers a bridge barrier clearance of 4.4m, a pavement/sidewalk clearance of 4.4m and a horizontal underb