Skip to main content

Sateco launches lift shaft podium

Sateco says its new lift shaft podium (PCA) makes it possible to block and secure access to lift shafts during building work. It also maximises secure work and material storage space during the time it takes to build up concrete shells. Due to its adjustable telescopic feet and the dimension markings every 10cm along its adjustment pipes, it can be perfectly adjusted between heights of 2.7m and 4m. Its wooden working platform can also be extended using sliding cross-pieces that require neither screws nor na
April 12, 2012 Read time: 2 mins
Sateco is unveiling its new lift shaft podium at Intermat 2012.
3202 Sateco says its new lift shaft podium (PCA) makes it possible to block and secure access to lift shafts during building work. It also maximises secure work and material storage space during the time it takes to build up concrete shells.

Due to its adjustable telescopic feet and the dimension markings every 10cm along its adjustment pipes, it can be perfectly adjusted between heights of 2.7m and 4m. Its wooden working platform can also be extended using sliding cross-pieces that require neither screws nor nails. The lift shaft podium can be extended from a square platform measuring 1.6m x 1.6m to a large format rectangular platform measuring 2.5m x 2.6m, in steps of 1cm length and 5cm width.

Fully foldable and collapsible, making it easy to transport, the podium is delivered with foldable access ladder with integrated safety bow for fitting between floors.

%$Linker: External 0 0 0 oLinkExternal <span class="mouselink">www.sateco-coffrages.com</span> Sateco false http://www.sateco-coffrages.com/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Haver & Boecker is adding to its screen range with wire and polyurethane screen decks
    February 8, 2013
    Haver & Boecker is expanding its screen range with the addition of the Ty-Wire hybrid screen deck and of ultrasound screen decks. Ty-Wire hybrid screens use wire that is covered in polyurethane, providing a greater open area than a standard PU screen but with a lifetime that can be 4-6 times longer.
  • New technical centre boosts CMS Cepcor
    January 6, 2017
    Crusher spares specialist CMS Cepcor has opened a new technical centre at Coalville in the UK and has now transferred its Baguley Precision Engineering business into the newly formed Precision Services Division. The company has moved machine servicing from Burton-on-Trent to the new technical centre and retained all the engineering staff. Within the centre is a CNC manufacturing capability, which will enhance the manufacturing, inspection and repair facilities at Coalville.
  • New technical centre boosts CMS Cepcor
    April 18, 2013
    Crusher spares specialist CMS Cepcor has opened a new technical centre at Coalville in the UK and has now transferred its Baguley Precision Engineering business into the newly formed Precision Services Division. The company has moved machine servicing from Burton-on-Trent to the new technical centre and retained all the engineering staff. Within the centre is a CNC manufacturing capability, which will enhance the manufacturing, inspection and repair facilities at Coalville.
  • Bell will push the boundaries in ADT design
    February 6, 2013
    Bell Equipment is working on its biggest ever truck, which will offer a capacity of 55tonnes. A launch date has not yet been revealed for the hauler and technical details have yet to be revealed, however the machine will have a 4x4 drive system. Marc Schürmann managing director of Bell Equipment Europe said prototype testing for the machine will commence later this year. He said “Our competitors will be the smaller class of rigid haulers,” and he added that the aim is to offer lower fuel consumption and cap