Skip to main content

Romanian roads for STRABAG

Austrian contractor STRABAG will build a 24km stretch of highway in Romania in a deal worth €166 million.
February 28, 2012 Read time: 1 min
Austrian contractor 945 Strabag will build a 24km stretch of highway in Romania in a deal worth €166 million. The highway will feature two lanes of traffic in either direction as well as hard shoulders and will take 22 months to complete.

The deal is the follow-up lot to the highway section STRABAG is building between Deva and Orãºtie. This earlier package was awarded in November 2010. The highway running from Orãºtie and Sibiu forms part of the Pan-European Corridor 4 from the Romanian-Hungarian border at Nãdlac and running through capital Bucharest to Constanta on the Black Sea.

The order is being financed 85 % by European funds (European Funds POS-T) and by funds from the Romanian national budget. The client for the work is the Compania Nationala de Autostrazi si Drumuri Nationale din Romania. The deal is the latest in a series of orders STRABAG has won in Romania. The company generated over 60 % of its output volume in transportation infrastructures in Romania during 2010. Besides the A1, the firm is also working on national roads DN 14 and 15a, DN 19 and DN 67B with an order value of some €450 million.

For more information on companies in this article

Related Content

  • STRABAG working on Slovakian highway
    December 16, 2013
    A consortium is now working on the construction of one stretch of Slovakia’s D1 highway. The section lies between Hričovské Podhradie and Lietavská Lúčka and the project is worth €427 million. The consortium comprises four companies; with Doprastav, Váhostav and STRABAG all holding equal 32% stakes of the contract and Metrostav having a minority 4% share. The work being carried out by Doprastav, Váhostav and STRABAG is equivalent to some €140 million each. The construction work is expected to take 48 months
  • Work underway on key Romanian projects
    March 28, 2022
    Work is well underway on key Romanian road and bridge projects.
  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
  • STRABAG wins contract for Hamburg, Germany
    August 26, 2020
    STRABAG has won a major highway contract in Hamburg, Germany.