Skip to main content

Romania set to start Sebes-Turda motorwa construction

Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges. Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania. Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the European Union as grants and the central gover
November 7, 2014 Read time: 2 mins
Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges.

Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania.

Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the 1116 European Union as grants and the central government investing the remaining 15%.

Cecan said the motorway will be completed by March 2016 and run north from Sebes, with a population of around 25,000, to Turda with a population of 45,000.

Sebes is at the crossroads of two main highways in Romania: E68 European route - DN1 coming from Sibiu and going towards Deva and E81 European route - DN7 coming from Sibiu and going towards Alba-Iulia and Cluj.

Construction work on the motorway is split into four contracts, awarded last year.

Lot 1 – 17km from the highway entrance near the interchange with the A1 motorway at Sebeș to Paraul Iovului – was awarded to the Italian consortium 7809 Salini Impregilo at a cost of nearly $151 million (539,488,704 lei).

Lot 2, around 24km from Paraul Iovului to Aiud, was awarded to an Italian-Romanian consortium that includes RCM Costruzioni, Shelter Construct and Eurocerad International for nearly $128.5 million (460,019,270 lei).

The 12.5km Lot 3 section from Aiud to the Decea interchange is being built by the consortium of Tirrena Scavi and Societa Italiana per Condotte d'Acqua at a cost of cost of $117.5 million (420,511,921 lei).

Lot 4, around 16km from the Decea interchange to the interchange with the A3 motorway near Turda, was awarded to the Romanian division of 3976 Porr Group, Porr Construct SRL, German division Porr Bau, for a cost of $131.4 million (470,004,894 lei).

For more information on companies in this article

Related Content

  • UK road development plan – funding secures
    October 3, 2019
    Funding has been secured in the UK for 18 road improvement schemes intended to cut journey times. These works have been given the go ahead by the Department for Transport. The projects include the Preston western distributor scheme, which will provide a new dual carriageway to reduce congestion in the city, and the 3.5km Stubbington bypass. Seven other schemes will be awarded funding to develop their business cases. These include the A140 Long Stratton Bypass, which will divert traffic away from busier rou
  • Herrenknecht's record-breaker
    February 13, 2012
    A Herrenknecht S-574 Earth Pressure Balance Shield is being used on a major highway project in Italy.
  • North Carolina contract for Lane
    October 6, 2021
    Lane Construction is to work on a major North Carolina contract.
  • Australian award
    November 27, 2012
    Two major awards have been given to the Gateway Upgrade Project in Queensland, Australia. One of these was for engineering excellence while the other was the overall RW Hawken Award. These were given as part of the Engineering Australia Awards (Queensland Division) scheme. Following this, the Gateway Project will now be a contender for the national Australian Engineering Excellence Awards being held in November 2012. The Gateway Upgrade is of note as it is one of the largest road and bridge projects ever ca