Skip to main content

Road repairs will revamp the ring road around St Petersburg

Repair work is now planned on the first section of the St Petersburg ring road. The work will be carried out from Gorskaya to Primorskoe in 2013. Design work is underway at present. The 24km road will be widened to six lanes and the road structure will be revamped. The repair will end in 2015 and will cost some US$373 million. Work on the interchange in Bronka will commence in 2013 as well.
April 19, 2012 Read time: 1 min
Repair work is now planned on the first section of the St Petersburg ring road. The work will be carried out from Gorskaya to Primorskoe in 2013. Design work is underway at present. The 24km road will be widened to six lanes and the road structure will be revamped. The repair will end in 2015 and will cost some US$373 million. Work on the interchange in Bronka will commence in 2013 as well.

Related Content

  • Mexican project to be completed
    August 11, 2020
    A key Mexican road project will now be completed.
  • Upgrade for Scottish road
    February 17, 2012
    Work is progressing on a £320 million (e385 million) project to upgrade a busy 18km stretch of the main A80 Glasgow-Stirling road in Scotland to motorway standard. The project, between the villages of Stepps and Haggs, is part of a massive infrastructure investment in Scotland's transport network, and construction work includes almost 8km of new dual-lane motorway and hard shoulders between
  • Tunnel technology improves driving safety
    February 14, 2012
    Tunnel technology advances will make driving through underground links considerably safer, writes Mike Woof
  • Colombian highway projects under development
    June 29, 2018
    A finance package has been secured in Colombia for the Autopista al Mar 1 highway project. A loan worth close to US$206 million is being provided by the national development bank, Financiera de Desarrollo Nacional (FDN). The highway forms part of Colombia’s 4G infrastructure development plan and the finance package will be provided in three separate tranches. The construction work is being carried out by a consortium comprising Strabag, Concay and Sacyr Concesiones. The project will upgrade the 71km