Skip to main content

Road repairs will revamp the ring road around St Petersburg

Repair work is now planned on the first section of the St Petersburg ring road. The work will be carried out from Gorskaya to Primorskoe in 2013. Design work is underway at present. The 24km road will be widened to six lanes and the road structure will be revamped. The repair will end in 2015 and will cost some US$373 million. Work on the interchange in Bronka will commence in 2013 as well.
April 19, 2012 Read time: 1 min
Repair work is now planned on the first section of the St Petersburg ring road. The work will be carried out from Gorskaya to Primorskoe in 2013. Design work is underway at present. The 24km road will be widened to six lanes and the road structure will be revamped. The repair will end in 2015 and will cost some US$373 million. Work on the interchange in Bronka will commence in 2013 as well.

Related Content

  • Atkins is working on major deals for Texas and Florida
    March 10, 2014
    Atkins is working on major contracts in Texas and Florida for tolling and design and build services respectively. In Texas the Department of Transportation (TxDOT) reselected Atkins as its state-wide prime consultant for toll-plaza planning, development, and implementation. Under the terms of the five-year, $10 million contract, Atkins is providing planning, development, infrastructure design and coordination, and construction oversight services, as well as system installation, integration, and testing serv
  • Sri Lanka's new highway - on track
    February 14, 2012
    Work is progressing on-track on Sri Lanka's Southern Expressway project. This will be the country's first expressway and is expected to be completed by 2012, removing the bulk of traffic from the existing coastal road that is highly congested and also has serious safety issues.
  • Eurovia, Stavby and PORR win Prague D0
    November 19, 2024
    According to Czech media, the consortium offered the lowest price for the D0 section, €413.24 million - significantly less than the estimated €595 million.
  • Major earthmoving equipment order for key highway
    February 24, 2012
    An order for six MT31 ADTs forms part of a new fleet of Doosan machines delivered to Hydrobudowa, a Polish contractor specialising in complex civil engineering, infrastructure and construction projects. The deal also comprises four Doosan excavators, two DX300LC models and two DX340LC units, all of which have been supplied by dealer, Grausch i Grausch maszyny Budowlane. Five of the new Doosan ADTs are currently working on the construction of the Bojanowo - Rawicz section of the new highspeed S5 Expresswa