Skip to main content

Rain storms destroy Beijing’s road surfaces

As heavy rain storms continue to batter the Chinese capital, Beijing, the number of collapsed road pavements has soared to record levels, according to the city's road and bridge maintenance authority. Since the start of the flooding on July 21 until mid-August, Beijing Municipal Bridge Maintenance Management Group, a State-owned business set up to repair the city’s bridges and roads, received nearly 300 emergency calls regarding collapsed road surfaces.
August 17, 2012 Read time: 2 mins
As heavy rain storms continue to batter the Chinese capital, Beijing, the number of collapsed road pavements has soared to record levels, according to the city's road and bridge maintenance authority.

Since the start of the flooding on July 21 until mid-August, Beijing Municipal Bridge Maintenance Management Group, a State-owned business set up to repair the city’s bridges and roads, received nearly 300 emergency calls regarding collapsed road surfaces.

"Our hotline operators are receiving about 25 calls a day as a result of the heavy downpours,” a spokesman for the emergency information department of the group told local reporters.

A road surface on the crossing between Huajiadi Street and Wanghua Road, in Chaoyang district, caved in earlier this month leaving a two metre deep hole covering at least 10 square metres of pavement. According to the maintenance group, the collapse was caused by loosened soils that were eroded by the persistent rains as well as leaks in underground water pipes.

The Beijing Maintenance Group says that is has now deployed at least 2,561 workers to deal with collapsed pavements or waterlogged roads. "Our workers can repair small holes, of about one to two 2 square meters, within 24 hours,” said the spokesman. “But for bigger ones we need to work up a plan and think about the underground pipes for natural gas and water.”

The company has patrol teams out watching the whole city, paying special attention to lower-ground sections under bridges or on roads, he said, adding “we've also used radar vans to estimate underground conditions and help maintenance workers.”

In addition, the Beijing government also posted a message on its micro blog providing the maintenance group's hotline and asking people to call the police if they spot dangerous areas.

This will not solve the problem though, says Jiang Zhongguang, a city planning professor at the Beijing University of Civil Engineering and Architecture. He believes that the key problem behind the collapsed pavements is lack of regular maintenance.

"Workers didn't fill holes thoroughly and they often leave gaps,” he says. “And this causes soil erosion. The weather is out of our control, but other problems can be solved with regular maintenance."

Related Content

  • TISPOL Conference: autonomous vehicles high on safety agenda
    February 2, 2017
    Safety and autonomous vehicles exercised the minds of some of Europe’s senior police officers at the recent TISPOL European Traffic Police Network Conference in the UK. The European Union looks like missing its target of halving the number of people killed on its roads each year by 2020. Just when European police forces are trying to get back on target, along comes the autonomous vehicle with all its inherent safety issues.
  • Road planing
    May 14, 2014
    In New York, a pilot and his two passengers had a lucky escape when the engine of their light aircraft failed. And road construction workers played a key role in ensuring that there were no casualties in the incident. When the road crew spotted the Piper Cherokee gliding in, dead stick, towards the Major Deegan Expressway they realised what was about to happen and parked their vehicles so as to halt traffic on the busy roadway. The rapid descent meant that the pilot brought the aircraft down hard onto the s
  • RAP extends road maintenance and construction budgets
    October 26, 2020
    As fuel tax revenue disappears in the pandemic, the city of Janesville, Wisconsin is seeing savings and performance benefits
  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f