Skip to main content

£495 million National Highways specialist contract

A £495 million National Highways specialist engineering advice contract has been awarded.
By MJ Woof July 1, 2025 Read time: 2 mins
M42: A new stretch of dual carriageway in the UK is now open and will cut journey times for drivers


A £495 million contract has been awarded by National Highways to AtkinsRéalis Jacobs Joint Venture, Ove Arup & Partners, Amey, Arcadis, Costain, and WSP in collaboration with Mott MacDonald. This for a new Specialist Professional and Technical Services Framework (SPaTS3) contract. The firms will have been selected by National Highways for the SPaTS3, technical engineering advice framework.

This advisory and engineering role is intended to help the highways network drive economic growth, improve safety and reliability, and further the UK’s decarbonisation goals. This builds on the foundations laid under the SPaTS2 framework, which Costain was previously selected for. The SPaTS3 Framework has an estimated maximum value of up to £495 million to the six suppliers over its six-year term and will cover the whole of Roads Investment Strategy 3. 

The services under the framework will encompass geotechnical engineering, asset operation, maintenance, assurance, performance, design standards manuals and departures, environmental, highways structures, sustainability, and transport engineering services.

The previous framework, SPaTS2, facilitated specialist advice and support through the Second Road Investment Strategy.

Meanwhile, a new stretch of dual carriageway in the UK will improve journey times for drivers. The A4545 dual carriageway links the newly built junction 5a on the M42 with Clock Interchange roundabout – providing people with direct access from the M42 to Birmingham Business Park, Birmingham Airport and the A45 to Birmingham, whilst also acting as an alternative route into the National Exhibition Centre.

The 2.4km stretch initially opened with one lane running in both directions at the end of last year but now permanent traffic management has been removed, and the road is fully up and running helping to relieve traffic congestion at junction 6 and poor journey reliability in the area.

With work due to complete on the M42 Junction 6 scheme this winter, National Highways has revealed that by combining works along the corridor it has been able to avoid 8,892 hours of closures, saving the taxpayer over £650,000 and preventing 1,072tonnes of carbon emissions.

So far, HS2 works, utility company work and National Highways maintenance and survey schemes have been completed during the M42 closures and project teams working in the area continue to identify opportunities to reduce disruption and save money.

For more information on companies in this article

Related Content

  • $10 billion for Nigerian coastal highway
    March 28, 2025
    Construction of Nigeria’s coastal highway could cost $10 billion.
  • US$223 million loan for Bolivian road works
    December 26, 2023
    A US$223 million loan will pay for Bolivian road works.
  • Crash barriers aid vehicle protection, road safety
    February 8, 2012
    Barrier and crash cushion systems can make a great deal of difference to roadway safety, with new technology offering major benefits to road users. In North America and Western Europe, concrete centre line dividers are being used for many major highways as these provide a durable solution for preventing cross-over accidents with large vehicles such as heavy trucks. It is worth noting too that other countries are now adopting concrete barriers for highway centre line dividers also, with this system being use
  • Amey installing LED luminaires in a 3-year contract in Manchester
    February 8, 2018
    Amey has begun work in the UK city of Manchester replacing traditional discharge lamps with 56,000 LED luminaires in street lights under a three-year contract. Amey said that the LED lights will deliver significant energy and carbon emissions reductions, being around 60% more energy efficient. They provide more robust in-light service and improved colour recognition qualities with significantly reduced maintenance activities and running costs. Amey estimates that the upgrade will cut more than 7,000tonne