Skip to main content

Prequalification tender for Oman carriageway project floated

The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
June 13, 2013 Read time: 2 mins
The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate.

Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.

The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be 3086 Daewoo Engineering and Construction of South Korea, Yuksal Construction, 2709 STFA of Turkey, CCC, 2379 Ghantoot Transport of the UAE, NUEC, 3340 Makyol of Turkey, GKC Projects of India, Leighton Middle East, SEW Infra of India, GS Engineering of South Korea, Kayson of Iran, 945 Strabag Oman, 4921 TOTO, 5739 Hyundai Engineering & Construction of South Korea, 5544 Sinohydro of China, Galfar, IsoluxCorsan of Spain, 4148 Mapa GUNA, 980 OHL Construction of Spain, Hanjin Heavy Industries of South Korea, Sambu Construction of South Korea, Oman Shapoorji, Orascon, 3149 Impregilo of Italy, Ozkar Construction of Turkey, 5177 Vinci of France, Wade Adams of the UAE, 4138 Bechtel, Impresa of Italy and Cyfield

For more information on companies in this article

Related Content

  • Ireland's highway and tunnel projects
    May 10, 2012
    Northern Ireland construction company, Lagan Construction, is celebrating its part in two major infrastructure projects in Ireland. The company said that the openings of the A1 dual carriageway bypass at Newry, Northern Ireland, and the Limerick Tunnel, Republic of Ireland, were major achievements, and had employed 350 people over the past four years. The €138 million Newry bypass, commissioned by the Roads Service in December 2007 and completed five months ahead of schedule, was delivered by Amey Lagan
  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
  • More EU money for Fehmarn Belt Link
    July 4, 2022
    The money underlines the importance of the 17.6km Fehmarnbelt tunnel project for the entire European road network.
  • Brazil launches new transport infrastructure investment plan
    August 30, 2012
    The Brazilian government has announced a new transport infrastructure investment plan involving the concession of motorway operations and modernisation of the railway sector. The private public partnerships are predicted to lead to an investment of US$65.68 billion (BRL 133bn) in the next 25 years, including US$ 39.63 billion (BRL 80bn) to be spent in the first five years of the contract.