Skip to main content

Prequalification tender for Oman carriageway project floated

The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
June 13, 2013 Read time: 2 mins
The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate.

Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.

The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be 3086 Daewoo Engineering and Construction of South Korea, Yuksal Construction, 2709 STFA of Turkey, CCC, 2379 Ghantoot Transport of the UAE, NUEC, 3340 Makyol of Turkey, GKC Projects of India, Leighton Middle East, SEW Infra of India, GS Engineering of South Korea, Kayson of Iran, 945 Strabag Oman, 4921 TOTO, 5739 Hyundai Engineering & Construction of South Korea, 5544 Sinohydro of China, Galfar, IsoluxCorsan of Spain, 4148 Mapa GUNA, 980 OHL Construction of Spain, Hanjin Heavy Industries of South Korea, Sambu Construction of South Korea, Oman Shapoorji, Orascon, 3149 Impregilo of Italy, Ozkar Construction of Turkey, 5177 Vinci of France, Wade Adams of the UAE, 4138 Bechtel, Impresa of Italy and Cyfield

For more information on companies in this article

Related Content

  • Contract for Romanian highway construction signed
    May 10, 2012
    In Romania the road authorities have signed a deal for the construction of a 22km stretch of highway in a contract worth €91 million. The Portuguese contractor Monte Adriano will construct the section linking Nadlac with Pecica. Romania has pledged to improve and expand its highway network with the construction of new links, and much of the funding for its highway plans has been provided by the European Bank for Reconstruction and Development and the European Investment Bank (EIB).
  • East Africa’s dream of a ‘Silk Road’ in sight
    October 22, 2021
    East Africa’s dream of a ‘Silk Road’ route to boost trade and transport is now in sight
  • $3.5 billion Peru bypass project commencing
    June 20, 2025
    The $3.5 billion Lima, Peru bypass project is commencing
  • STRABAG reports satisfactory financial performance
    February 22, 2016
    Construction firm STRABAG says that its performance in the 2015 financial year was ‘satisfactory’ and that its outlook for 2016 is positive. “We closed an overall satisfactory year in 2015 with a higher output volume on nearly unchanged employee levels and a lower order backlog. In 2016 we want to maintain the output volume at its high level and raise our EBIT margin to 3%. Thanks to our improved risk management and cost reductions, we are confident that we will reach this goal after having also succeeded i