Skip to main content

Peri premiere’s PROKIT EP 110 at INTERMAT 2012

Peri is unveiling its new safety system for building shells at INTERMAT 2012. The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells.
January 6, 2017 Read time: 2 mins
Peri launches new quickly mounted protection for open slab edges on building shells
298 PERI unveiled its new safety system for building shells at INTERMAT 2012.

The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells. The innovative product prevents site personnel or objects and materials falling off edges, stairs and other areas up to inclination angles of 10%.

Fully compliant with EN 13374 Class A, the PROKIT EP 110 has minimised system parts to ensure swift and easy application: a 2.6m long mesh barrier, one post and assembly feet for slabs or walls. Through the overlapping variations of the mesh barrier, every edge length can be secured while a 1.3m long side mesh barrier is also available for length compensations. Peri says the small number of system components not only simplifies the assembly process, but also material needs and logistics.

Depending on site specifics, mounting takes place on the slab, laterally on the slab or wall, or on the stair stringer.

If no mounting parts are permitted in the slab and drilling is not allowed, the PROKIT Uniclamp PUC can be used. The clamp is attached by means of a jack nut to the slab or parapet. Subsequently, the self-securing posts are inserted and supplemented by the protective barrier.

A distinctive yellow or red coloured powder coating on the side mesh barrier is said by Peri to guarantee a long service life for the PROKIT EP 110. It also makes the safety barriers more visible from distance, advertising the danger area.

%$Linker: External 0 0 0 oLinkExternal www.peri.fr PERI false http://www.peri.fr/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Business booming at JLG
    April 12, 2012
    JLG’s diesel-powered 510AJ boom lift, with a working height of 17.81metres, is said by the American firm to be specifically designed and produced for the European market, providing high level access with a spacious work platform. The machine is said to be ideal for use in confined locations and can be set up and re-positioned quickly in narrow, compact spaces. Other work can carry on around it relatively undisturbed due to low sound levels while operating.
  • Boom time at JLG
    January 6, 2017
    Unveiled as a prototype at SAIE, Italy in October 2010, the compact 340AJ boom lift can cope with grades and break-over angles up to 45° allowing it to drive on slopes and up ramps. Built to a working height of 12.35metres and with a horizontal outreach of 6.07metres, the 340AJ is said by JLG to meet demands for a broad range of applications. The jib extends to 1.2metres with near vertical operation. When ground conditions get tough, proper off-road performance is ensured by the standard oscillating axle an
  • Boom time at JLG
    April 12, 2012
    Unveiled as a prototype at SAIE, Italy in October 2010, the compact 340AJ boom lift can cope with grades and break-over angles up to 45° allowing it to drive on slopes and up ramps. Built to a working height of 12.35metres and with a horizontal outreach of 6.07metres, the 340AJ is said by JLG to meet demands for a broad range of applications. The jib extends to 1.2metres with near vertical operation. When ground conditions get tough, proper off-road performance is ensured by the standard oscillating axle an
  • Economise with Zigma EconoMat
    January 6, 2017
    Zigma Ground Solutions will be exhibiting its new, austerity-focused EconoMat product during its debut appearance at Intermat 2012. EconoMat provides a new lightweight but strong temporary access and ground protection solution and is particularly suited to the event industry. The mat is made from 100% recycled polyethylene and is 100% recyclable. Its light weight of 29kg makes it easy to transport, manoeuvre and deploy. Zigma says its new product fills a need for a temporary access product, delivering many