Skip to main content

Peri premiere’s PROKIT EP 110 at INTERMAT 2012

Peri is unveiling its new safety system for building shells at INTERMAT 2012. The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells.
January 6, 2017 Read time: 2 mins
Peri launches new quickly mounted protection for open slab edges on building shells
298 PERI unveiled its new safety system for building shells at INTERMAT 2012.

The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells. The innovative product prevents site personnel or objects and materials falling off edges, stairs and other areas up to inclination angles of 10%.

Fully compliant with EN 13374 Class A, the PROKIT EP 110 has minimised system parts to ensure swift and easy application: a 2.6m long mesh barrier, one post and assembly feet for slabs or walls. Through the overlapping variations of the mesh barrier, every edge length can be secured while a 1.3m long side mesh barrier is also available for length compensations. Peri says the small number of system components not only simplifies the assembly process, but also material needs and logistics.

Depending on site specifics, mounting takes place on the slab, laterally on the slab or wall, or on the stair stringer.

If no mounting parts are permitted in the slab and drilling is not allowed, the PROKIT Uniclamp PUC can be used. The clamp is attached by means of a jack nut to the slab or parapet. Subsequently, the self-securing posts are inserted and supplemented by the protective barrier.

A distinctive yellow or red coloured powder coating on the side mesh barrier is said by Peri to guarantee a long service life for the PROKIT EP 110. It also makes the safety barriers more visible from distance, advertising the danger area.

%$Linker: External 0 0 0 oLinkExternal www.peri.fr PERI false http://www.peri.fr/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • 4x4 Canter is start turn on Mercedes Benz stand
    April 19, 2012
    A 4x4 version of Mitsubishi’s Canter light truck premiered at INTERMAT on the stand of its sister company Mercedes Benz, which distributes the vehicles in Europe. The 6.5tonne GVW vehicle is fitted with a transfer box that diverts half of the torque to the front wheels at the touch of a button and can be engaged while still on the move.
  • WN’s steer in right direction
    January 6, 2017
    It might be logical to think that bigger construction machines will be harder to steer – but then there’s the Wacker Neuson DT25 crawler-mounted dumper.
  • WN’s steer in right direction
    March 9, 2012
    It might be logical to think that bigger construction machines will be harder to steer – but then there’s the Wacker Neuson DT25 crawler-mounted dumper.
  • Sany reveals SYG 5260 and 5320 conveyor units
    January 6, 2017
    The conveyor units for Sany’s new SYG 5260 THB 36 and SYG 5320 THB 42 concrete pumps are fitted, according to the company, with precision electronic controls that act as ‘electronic brains’ to store vital data. Any errors trigger an instant notification in the colour display. The built-in hydraulic drive unit saves up to 20% of energy. Another key feature is the fully hydraulic sequence control of the conveyor unit in a secure and open hydraulic circuit. The automatic pressure equalisation when switching th