Skip to main content

Peri premiere’s PROKIT EP 110 at INTERMAT 2012

Peri is unveiling its new safety system for building shells at INTERMAT 2012. The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells.
January 6, 2017 Read time: 2 mins
Peri launches new quickly mounted protection for open slab edges on building shells
298 PERI unveiled its new safety system for building shells at INTERMAT 2012.

The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells. The innovative product prevents site personnel or objects and materials falling off edges, stairs and other areas up to inclination angles of 10%.

Fully compliant with EN 13374 Class A, the PROKIT EP 110 has minimised system parts to ensure swift and easy application: a 2.6m long mesh barrier, one post and assembly feet for slabs or walls. Through the overlapping variations of the mesh barrier, every edge length can be secured while a 1.3m long side mesh barrier is also available for length compensations. Peri says the small number of system components not only simplifies the assembly process, but also material needs and logistics.

Depending on site specifics, mounting takes place on the slab, laterally on the slab or wall, or on the stair stringer.

If no mounting parts are permitted in the slab and drilling is not allowed, the PROKIT Uniclamp PUC can be used. The clamp is attached by means of a jack nut to the slab or parapet. Subsequently, the self-securing posts are inserted and supplemented by the protective barrier.

A distinctive yellow or red coloured powder coating on the side mesh barrier is said by Peri to guarantee a long service life for the PROKIT EP 110. It also makes the safety barriers more visible from distance, advertising the danger area.

%$Linker: External 0 0 0 oLinkExternal www.peri.fr PERI false http://www.peri.fr/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Volvo’s new pavers have perkier performance
    April 17, 2012
    The latest tracked asphalt pavers from Volvo Construction Equipment get independent travel drives and electronic traction control to help maintain productivity on slopes and around corners. The P8820C ABG can pave widths from 2.5m up to 13m and handle 1,100tonnes/hour, while the P7820C ABG paves up to 11m and places up to 900tonnes/hour.
  • Hyundai launches Dash 9A wheeled loaders at INTERMAT
    January 6, 2017
    Hyundai Heavy Industries Europe (HHIE) used INTERMAT to start the roll-out of its Dash 9A wheeled loaders. First up are the HL760, HL770 and HL780 models, which get Cummins QSB Stage IIIb engines with an active regeneration system that uses controlled, in-cylinder fuel injection (rather than a fuel burner) to achieve the desired reduction in engine emissions. Among the tweaks are a relocated fan to improve cooling efficiency and maintenance access, a touch-screen LCD display and electronic smart key – the l
  • Hyundai launches Dash 9A wheeled loaders at INTERMAT
    April 18, 2012
    Hyundai Heavy Industries Europe (HHIE) used INTERMAT to start the roll-out of its Dash 9A wheeled loaders. First up are the HL760, HL770 and HL780 models, which get Cummins QSB Stage IIIb engines with an active regeneration system that uses controlled, in-cylinder fuel injection (rather than a fuel burner) to achieve the desired reduction in engine emissions. Among the tweaks are a relocated fan to improve cooling efficiency and maintenance access, a touch-screen LCD display and electronic smart key – the l
  • Anaconda shows off screener and conveyor
    February 26, 2013
    Anaconda Equipment International will have two products on display at its first bauma: the DF410 tracked screener and a TR60 18m track-mounted stockpiling conveyor. The DF410 entry level screener can screen and stockpile up to 250tonnes/hour of material into three sizes, and is said to be ideal for those restricted by working area in urban areas.