Skip to main content

Peri launched UP MDS Formwork at INTERMAT 2012

Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
February 3, 2012 Read time: 2 mins
Peri UP MDS formwork live at INTERMAT 2012
298 PERI is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012.

The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs).

The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of the platform is divided by 2, with the heaviest item weighing 16kg) by systemising the erection and the dismantling operations, and by reducing unnecessary movements, bad postures and, as a result, the risk of MSDs.

The optimisation of safety and ergonomics are, according to Peri, what differentiate the UP MDS from all other solutions currently on the market.

Despite the tough global economic climate, Stéphanie Derouet, management assistant at Peri, said that company product sales had gone up since 2010.

“Poland is a booming market and Ukraine is also good, partly because of the need to build new facilities for Euro 2012,” said Derouet.

“We also provide the tunnel formwork for the Panama Canal works. It’s the biggest contact Peri has. Work is being done to make the Canal bigger to allow bigger boats access.”

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.peri.fr PERI false http://www.peri.fr/ false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Wirtgen launches cold recycler and soil stabiliser at INTERMAT
    January 6, 2017
    Wirtgen’s new generation of its cold recycler and soil stabiliser, the WR 240i, features a cab that can be offset beyond the side of the machine, giving a clear view of the milled edge.
  • Wirtgen launches cold recycler and soil stabiliser at INTERMAT
    February 7, 2012
    Wirtgen’s new generation of its cold recycler and soil stabiliser, the WR 240i, features a cab that can be offset beyond the side of the machine, giving a clear view of the milled edge.
  • Sennebogen premieres 70tonne telescopic crane
    January 6, 2017
    Sennebogen has plugged the gap in its telescopic crawler crane range with the introduction of the 673R-HD. The 70tonne capacity machine sits between the firm’s 40 and 80tonne models, offering a 36m four-stage main boom with two fly booms of 8m and 15m. This gives a maximum reach of 51m. The 673R-HD is powered by a Stage IIIB/Tier 4 Interim standard Deutz engine delivering 160kW. Telescopic track frames allow for a maximum transport width of just 3m, with fast set-up on site as they extend out to provide sta
  • Sennebogen premieres 70tonne telescopic crane
    April 19, 2013
    Sennebogen has plugged the gap in its telescopic crawler crane range with the introduction of the 673R-HD. The 70tonne capacity machine sits between the firm’s 40 and 80tonne models, offering a 36m four-stage main boom with two fly booms of 8m and 15m. This gives a maximum reach of 51m. The 673R-HD is powered by a Stage IIIB/Tier 4 Interim standard Deutz engine delivering 160kW. Telescopic track frames allow for a maximum transport width of just 3m, with fast set-up on site as they extend out to provide sta