Skip to main content

Parsons wins design services contract for Chicago’s Webster Street Bridge

Parsons Brinckerhoff has won a contract from the Chicago Department of Transportation (DOT) in the US to provide final and preliminary design services for the rehabilitation of Chicago’s Webster Street Bridge. The firm will also be in charge of coordination and community outreach with adjacent property owners, and coordination with the US Army Corps of Engineers, Illinois Environmental Protection Agency, Illinois Department of Natural Resources, and the US Coast Guard. Parsons will offer engineeri
December 11, 2012 Read time: 1 min
2693 Parsons Brinckerhoff has won a contract from the 7008 Chicago Department of Transportation (DOT) in the US to provide final and preliminary design services for the rehabilitation of Chicago’s Webster Street Bridge.

The firm will also be in charge of coordination and community outreach with adjacent property owners, and coordination with the US Army Corps of Engineers, 7005 Illinois Environmental Protection Agency, 7006 Illinois Department of Natural Resources, and the 7007 US Coast Guard. Parsons Brinckerhoff will offer engineering services to do the work associated with the approval and preparation of all preliminary engineering documents. Once the preliminary engineering reaches completion, Parsons Brinckerhoff will do phase-two design engineering, prepare construction contract documents, including specifications and estimates, final plans and review of construction shop drawings.

Rehabilitation works will begin in 2015, with construction due to reach completion the following year.

Related Content

  • Smombies! Look out!
    February 12, 2021
    Our city streets are being invaded by smartphone zombies, but help is on the way
  • US bridge deal to be handled by Tutor Perini
    September 29, 2022
    A major US bridge deal is to be handled by Tutor Perini.
  • Italy’s renaissance bridge
    July 21, 2020
    Italian consulting company Italferr created a digital twin for designing the new Genoa bridge and won accolades at Bentley Systems: Bentley Year in Infrastructure Awards
  • Acrow supplies temporary bridge during Turcot Interchange project
    June 28, 2018
    Acrow Bridge has supplied a long-term temporary modular bridge to main contractor KPH Turcot for its work on the Turcot Interchange reconstruction in Montréal, Canada. The 32.3m-long Turcot modular steel bridge - Acrow’s longest clear span bridge in Canada – is 5m wide and has an orthotropic deck. The rented Acrow components arrived on site late last year and the bridge was opened to traffic in December. It is expected to be in place for two years. The Turcot Interchange is a three-level stack freeway int