Skip to main content

Parsons wins design services contract for Chicago’s Webster Street Bridge

Parsons Brinckerhoff has won a contract from the Chicago Department of Transportation (DOT) in the US to provide final and preliminary design services for the rehabilitation of Chicago’s Webster Street Bridge. The firm will also be in charge of coordination and community outreach with adjacent property owners, and coordination with the US Army Corps of Engineers, Illinois Environmental Protection Agency, Illinois Department of Natural Resources, and the US Coast Guard. Parsons will offer engineeri
December 11, 2012 Read time: 1 min
2693 Parsons Brinckerhoff has won a contract from the 7008 Chicago Department of Transportation (DOT) in the US to provide final and preliminary design services for the rehabilitation of Chicago’s Webster Street Bridge.

The firm will also be in charge of coordination and community outreach with adjacent property owners, and coordination with the US Army Corps of Engineers, 7005 Illinois Environmental Protection Agency, 7006 Illinois Department of Natural Resources, and the 7007 US Coast Guard. Parsons Brinckerhoff will offer engineering services to do the work associated with the approval and preparation of all preliminary engineering documents. Once the preliminary engineering reaches completion, Parsons Brinckerhoff will do phase-two design engineering, prepare construction contract documents, including specifications and estimates, final plans and review of construction shop drawings.

Rehabilitation works will begin in 2015, with construction due to reach completion the following year.

Related Content

  • More on the Newmarket Viaduct replacement
    June 15, 2012
    When it was completed in 1965 – just six years after the Auckland Harbour Bridge – the six-lane Newmarket Viaduct with its tall, slender piers was something of an engineering wonder, the first of its kind in the Southern Hemisphere. Forty years on it had become a much-maligned contributor to Auckland’s chronic traffic congestion, too weak seismically to withstand the heaviest loaded trucks let alone a severe earthquake, so narrow in the shoulders that any accident stopped traffic flow and made it difficult
  • Key UK bridge project for A38
    October 29, 2024
    A key UK bridge project for the A38 over the HS2 route.
  • German highway project awarded
    January 25, 2021
    A key German highway project has been awarded.
  • CRCP is first choice for Belgian highway
    November 28, 2012
    Dan Gilkes reports on a Belgian highway upgrade When the Ministry of Public Works in the Belgian State of Flanders decided to reconstruct and resurface 19km of the N49 Antwerp-Knokke Expressway, continuously reinforced concrete paving (CRCP) with an exposed aggregate surface was the natural material choice. Indeed exposed aggregate, with its high grip and low noise benefits, has been the first option for all motorway surfacing work in Belgium since the 1980s. However, the €15.65 million contract is not a li