Skip to main content

Oerlikon is offering an array of new machine drive technologies

From Oerlikon’s drive brands Oerlikon Graziano and Oerlikon Fairfield comes an array of sophisticated new drive systems for an array of construction machinery applications. The GA rear axle system is a new generation of motor grader axles specifically designed with a complete tandem box. Wet disc brakes are fitted outboard on each wheel hub, which optimises braking performance, provides easier cooling and also meets international safety regulations. The firm’s axle range for graders includes of five differe
March 11, 2013 Read time: 2 mins
From 7214 Oerlikon’s drive brands Oerlikon Graziano and Oerlikon Fairfield comes an array of sophisticated new drive systems for an array of construction machinery applications. The GA rear axle system is a new generation of motor grader axles specifically designed with a complete tandem box. Wet disc brakes are fitted outboard on each wheel hub, which optimises braking performance, provides easier cooling and also meets international safety regulations. The firm’s axle range for graders includes of five different models to meet an array of needs for customers and suiting graders weighing from 7.8-20.5tonnes.

Meanwhile Oerlikon Fairfield is highlighting its drive solutions for large track-driven equipment. The CT65, CT90 and CT130 Torque-Hub drives provide maximum output torque ratings of 65,000Nm, 90,000Nm or 130,000Nm and a choice of gear reduction ratios from 70:1 up to 147:1. These triple planetary drive solutions extend the range of the Fairfield’s commercially successful final drives into larger mobile equipment applications including excavators, track-driven trenchers, drilling machines, tool carriers and cranes.

Stand: A5.133

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 82585 0 oLinkExternal www.Oerlikon.com www.Oerlikon.com false /EasySiteWeb/GatewayLink.aspx?alId=82585 false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Herrenkencht has developed a novel pipeline installation package
    January 6, 2017
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
  • Herrenkencht has developed a novel pipeline installation package
    February 6, 2013
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
  • Peri launched UP MDS Formwork at INTERMAT 2012
    January 6, 2017
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
  • Peri launched UP MDS Formwork at INTERMAT 2012
    February 3, 2012
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of